X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595210616000

Well Details

Well ID: 0595210616000
Loading map...
Location: 00/16-06-059-21W5/0
Location Alias: 00/16-06-59-21 W5M
Location Alias 2: 00/16-06-059-21 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 21
Section: 06
County/Municipality: Municipal District of Greenview No. 16
Well Name: CVE KAYBOBS 16-6-59-21
Operator Name: Cenovus Energy Inc.
License Number: 0423730
License Date: 2010-09-22
License Status: Suspension
Spud Date: 2010-12-29
Final Drill Date: 2011-01-17
Well Total Depth: 3590.00 m
Surface Hole Latitude: 54.065827
Surface Hole Longitude: -117.136913

For data sources see[1][2]

Well History

Date Event
2010-09-22 Obtained License
2010-12-31 Surface Casing Operation Performed
2011-01-01 Well Log Performed
2011-01-03 Direction Drilling Operation Performed - Horizontal
2011-01-05 Well Log Performed
2011-01-06 Intermediate Casing Operation Performed
2011-01-17 Finished Drilling
2011-01-17 Well Log Performed
2011-01-17 Well Mode changed to Drilled and Cased
2011-01-18 Liner Casing Operation Performed
2011-01-18 Perforation Treatment Performed - Open-Hole Completion
2011-01-19 Well Log Performed
2011-01-20 Rig Released
2011-02-19 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-05-14 Well Began Production
2011-05-14 Well Fluid changed to Crude Oil
2011-05-14 Well Mode changed to Pumping
2017-11-01 Well Fluid changed to Crude Oil
2017-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-03 1620.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-18 Open Hole/Barefoot Completion 3585.00 3590.00 0
2011-02-27 Multi-Stage Fracture 2900.20 2900.70 0
2011-02-27 Multi-Stage Fracture 2807.90 2808.40 0
2011-02-27 Multi-Stage Fracture 2701.20 2701.70 0
2011-02-27 Multi-Stage Fracture 2608.80 2609.30 0
2011-02-28 Multi-Stage Fracture 2488.30 2488.80 0
2011-02-28 Multi-Stage Fracture 2368.10 2368.60 0
2011-02-28 Multi-Stage Fracture 2234.10 2234.60 0
2011-02-19 Multi-Stage Fracture 3552.40 3552.90 0
2011-02-19 Multi-Stage Fracture 3551.40 3551.90 0
2011-02-26 Multi-Stage Fracture 3472.80 3473.30 0
2011-02-26 Multi-Stage Fracture 3370.50 3371.00 0
2011-02-26 Multi-Stage Fracture 3283.40 3283.90 0
2011-02-26 Multi-Stage Fracture 3176.90 3177.40 0
2011-02-27 Multi-Stage Fracture 3084.90 3085.40 0
2011-02-27 Multi-Stage Fracture 2992.60 2993.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4087 0.0 0.0 0.0
2012 8545 0.0 0.0 0.0
2013 8324 0.0 0.0 0.0
2014 8461 0.0 0.0 0.0
2015 8234 0.0 0.0 0.0
2016 2303 0.0 0.0 0.0

For data sources see[6]

References