X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595210101004

Well Details

Well ID: 0595210101004
Loading map...
Location: 00/01-01-059-21W5/4
Location Alias: 00/01-01-59-21 W5M
Location Alias 2: 00/01-01-059-21 W5/04
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 21
Section: 01
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACL HZ FIR 1-1-59-21
Operator Name: Paramount Resources Ltd.
License Number: 0434326
License Date: 2011-06-14
License Status: Amended
Spud Date: 2011-09-08
Final Drill Date: 2011-11-03
Well Total Depth: 3631.00 m
Surface Hole Latitude: 54.069158
Surface Hole Longitude: -117.020571

For data sources see[1][2]

Well History

Date Event
2011-06-14 Obtained License
2011-09-12 Surface Casing Operation Performed
2011-09-30 Direction Drilling Operation Performed - Deviate
2011-10-12 Direction Drilling Operation Performed - Deviate
2011-10-22 Intermediate Casing Operation Performed
2011-10-29 Direction Drilling Operation Performed - Deviate
2011-10-30 Direction Drilling Operation Performed - Horizontal
2011-11-03 Finished Drilling
2011-11-03 Well Log Performed
2011-11-03 Well Mode changed to Drilled and Cased
2011-11-05 Liner Casing Operation Performed
2011-11-05 Perforation Treatment Performed - Open-Hole Completion
2011-11-07 Rig Released
2011-12-18 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-21 Well Began Production
2011-12-21 Well Fluid changed to Gas
2011-12-21 Well Mode changed to Flowing
2016-12-18 Well Fluid changed to Gas
2016-12-18 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-30 630.00 Deviate (5 - 79 degrees)
2011-10-12 2517.00 Deviate (5 - 79 degrees)
2011-10-29 2678.00 Deviate (5 - 79 degrees)
2011-10-30 2762.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-05 Open Hole/Barefoot Completion 2677.00 3631.00 0
2011-12-18 Multi-Stage Fracture 3604.80 3604.90 0
2011-12-18 Multi-Stage Fracture 2857.40 2857.50 0
2011-12-18 Multi-Stage Fracture 2957.00 2957.10 0
2011-12-18 Multi-Stage Fracture 3059.60 3059.70 0
2011-12-18 Multi-Stage Fracture 3147.10 3147.20 0
2011-12-18 Multi-Stage Fracture 3249.40 3249.50 0
2011-12-18 Multi-Stage Fracture 3348.90 3349.00 0
2011-12-18 Multi-Stage Fracture 3436.50 3436.60 0
2011-12-18 Multi-Stage Fracture 3536.60 3536.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 19 0.0 0.0 0.0
2012 7060 0.0 0.0 0.0
2013 8487 0.0 0.0 0.0
2014 8196 0.0 0.0 0.0
2015 8089 0.0 0.0 0.0
2016 5602 0.0 0.0 0.0
2017 5600 0.0 0.0 0.0
2018 5311 0.0 0.0 0.0
2019 5028 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-01-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References