X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595203513000

Well Details

Well ID: 0595203513000
Loading map...
Location: 00/13-35-059-20W5/0
Location Alias: 00/13-35-59-20 W5M
Location Alias 2: 00/13-35-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 35
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 13-35-59-20
Operator Name: Paramount Resources Ltd.
License Number: 0418408
License Date: 2010-02-09
License Status: Issued
Spud Date: 2010-02-14
Final Drill Date: 2010-03-09
Well Total Depth: 3778.00 m
Surface Hole Latitude: 54.154215
Surface Hole Longitude: -116.877282

For data sources see[1][2]

Well History

Date Event
2010-02-09 Obtained License
2010-02-14 Lost Circulation Occurred
2010-02-19 Surface Casing Operation Performed
2010-02-24 Direction Drilling Operation Performed - Horizontal
2010-03-03 Intermediate Casing Operation Performed
2010-03-09 Finished Drilling
2010-03-09 Well Mode changed to Drilled and Cased
2010-03-10 Well Log Performed
2010-03-12 Liner Casing Operation Performed
2010-03-14 Rig Released
2010-03-17 Well Log Performed
2010-06-22 Perforation Treatment Performed - Multi-Stage Fracture
2010-06-22 Perforation Treatment Performed - Open-Hole Completion
2010-06-23 Well Began Production
2010-06-23 Well Fluid changed to Gas
2010-06-23 Well Mode changed to Flowing
2010-07-12 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-24 2611.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-06-22 Open Hole/Barefoot Completion 3773.00 3778.00 0
2010-06-22 Multi-Stage Fracture 2976.80 2976.90 0
2010-06-22 Multi-Stage Fracture 2875.30 2875.40 0
2010-06-22 Multi-Stage Fracture 2774.70 2774.80 0
2010-06-22 Multi-Stage Fracture 2697.70 2697.80 0
2010-06-22 Multi-Stage Fracture 3741.30 3741.40 0
2010-06-22 Multi-Stage Fracture 3664.70 3664.80 0
2010-06-22 Multi-Stage Fracture 3564.20 3564.30 0
2010-06-22 Multi-Stage Fracture 3476.40 3476.50 0
2010-06-22 Multi-Stage Fracture 3374.00 3374.10 0
2010-06-22 Multi-Stage Fracture 3270.80 3270.90 0
2010-06-22 Multi-Stage Fracture 3181.10 3181.20 0
2010-06-22 Multi-Stage Fracture 3079.20 3079.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 4371 0.0 0.0 0.0
2011 7679 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 8327 0.0 0.0 0.0
2014 7607 0.0 0.0 0.0
2015 4343 0.0 0.0 0.0
2016 72 0.0 0.0 0.0
2017 6384 0.0 0.0 0.0
2018 8351 0.0 0.0 0.0
2019 8543 0.0 0.0 0.0
2020 2016 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-02-14 Lost Circulation 35.00 539.00
2010-07-17 No Incident Encountered 0.00 0.00

For data sources see[7]

References