If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595203504020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.141929,"lon":-116.878849,"icon":""}]} |
Location: 02/04-35-059-20W5/0 | |
Location Alias: 02/04-35-59-20 W5M | |
Location Alias 2: 02/04-35-059-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 20 | |
Section: 35 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TRILOGY 102 HZ KAYBOBS 4-35-59-20 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0427880 | |
License Date: 2010-12-16 | |
License Status: Issued | |
Spud Date: 2010-12-29 | |
Final Drill Date: 2011-01-21 | |
Well Total Depth: 3938.00 m | |
Surface Hole Latitude: 54.141929 | |
Surface Hole Longitude: -116.878849 |
Date | Event |
---|---|
2010-12-16 | Obtained License |
2010-12-29 | Lost Circulation Occurred |
2011-01-02 | Surface Casing Operation Performed |
2011-01-08 | Well Log Performed |
2011-01-14 | Intermediate Casing Operation Performed |
2011-01-15 | Direction Drilling Operation Performed - Horizontal |
2011-01-21 | Finished Drilling |
2011-01-21 | Well Mode changed to Drilled and Cased |
2011-01-25 | Liner Casing Operation Performed |
2011-01-26 | Rig Released |
2011-02-05 | Well Log Performed |
2011-02-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-13 | Perforation Treatment Performed - Open-Hole Completion |
2011-02-14 | Well Began Production |
2011-02-14 | Well Fluid changed to Gas |
2011-02-14 | Well Mode changed to Flowing |
2011-03-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-11-17 | Well Fluid changed to Gas |
2014-11-17 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-01-15 | 2643.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-13 | Open Hole/Barefoot Completion | 3933.00 | 3938.00 | 0 |
2011-02-13 | Multi-Stage Fracture | 3317.10 | 3393.00 | 0 |
2011-02-13 | Multi-Stage Fracture | 3241.90 | 3317.00 | 0 |
2011-02-13 | Multi-Stage Fracture | 3167.20 | 3241.80 | 0 |
2011-02-13 | Multi-Stage Fracture | 3080.40 | 3167.10 | 0 |
2011-02-13 | Multi-Stage Fracture | 3005.20 | 3080.30 | 0 |
2011-02-13 | Multi-Stage Fracture | 2930.60 | 3005.10 | 0 |
2011-03-16 | Multi-Stage Fracture | 2844.60 | 2930.50 | 0 |
2011-03-16 | Multi-Stage Fracture | 2770.30 | 2844.50 | 0 |
2011-03-16 | Multi-Stage Fracture | 2695.10 | 2770.20 | 0 |
2011-03-16 | Multi-Stage Fracture | 2630.70 | 2695.00 | 0 |
2011-02-13 | Multi-Stage Fracture | 3923.70 | 3933.00 | 0 |
2011-02-13 | Multi-Stage Fracture | 3868.40 | 3923.60 | 0 |
2011-02-13 | Multi-Stage Fracture | 3789.90 | 3868.30 | 0 |
2011-02-13 | Multi-Stage Fracture | 3714.60 | 3789.80 | 0 |
2011-02-13 | Multi-Stage Fracture | 3628.90 | 3714.50 | 0 |
2011-02-13 | Multi-Stage Fracture | 3552.90 | 3628.80 | 0 |
2011-02-13 | Multi-Stage Fracture | 3479.10 | 3552.90 | 0 |
2011-02-13 | Multi-Stage Fracture | 3393.10 | 3479.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7271 | 0.0 | 0.0 | 0.0 |
2012 | 8663 | 0.0 | 0.0 | 0.0 |
2013 | 8567 | 0.0 | 0.0 | 0.0 |
2014 | 8207 | 0.0 | 0.0 | 0.0 |
2015 | 8183 | 0.0 | 0.0 | 0.0 |
2016 | 7823 | 0.0 | 0.0 | 0.0 |
2017 | 6168 | 0.0 | 0.0 | 0.0 |
2018 | 7703 | 0.0 | 0.0 | 0.0 |
2019 | 8591 | 0.0 | 0.0 | 0.0 |
2020 | 2135 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2010-12-29 | Lost Circulation | 94.00 | 581.00 |
For data sources see[7]