X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595203504020

Well Details

Well ID: 0595203504020
Loading map...
Location: 02/04-35-059-20W5/0
Location Alias: 02/04-35-59-20 W5M
Location Alias 2: 02/04-35-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 35
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY 102 HZ KAYBOBS 4-35-59-20
Operator Name: Paramount Resources Ltd.
License Number: 0427880
License Date: 2010-12-16
License Status: Issued
Spud Date: 2010-12-29
Final Drill Date: 2011-01-21
Well Total Depth: 3938.00 m
Surface Hole Latitude: 54.141929
Surface Hole Longitude: -116.878849

For data sources see[1][2]

Well History

Date Event
2010-12-16 Obtained License
2010-12-29 Lost Circulation Occurred
2011-01-02 Surface Casing Operation Performed
2011-01-08 Well Log Performed
2011-01-14 Intermediate Casing Operation Performed
2011-01-15 Direction Drilling Operation Performed - Horizontal
2011-01-21 Finished Drilling
2011-01-21 Well Mode changed to Drilled and Cased
2011-01-25 Liner Casing Operation Performed
2011-01-26 Rig Released
2011-02-05 Well Log Performed
2011-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-13 Perforation Treatment Performed - Open-Hole Completion
2011-02-14 Well Began Production
2011-02-14 Well Fluid changed to Gas
2011-02-14 Well Mode changed to Flowing
2011-03-16 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-17 Well Fluid changed to Gas
2014-11-17 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-15 2643.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-13 Open Hole/Barefoot Completion 3933.00 3938.00 0
2011-02-13 Multi-Stage Fracture 3317.10 3393.00 0
2011-02-13 Multi-Stage Fracture 3241.90 3317.00 0
2011-02-13 Multi-Stage Fracture 3167.20 3241.80 0
2011-02-13 Multi-Stage Fracture 3080.40 3167.10 0
2011-02-13 Multi-Stage Fracture 3005.20 3080.30 0
2011-02-13 Multi-Stage Fracture 2930.60 3005.10 0
2011-03-16 Multi-Stage Fracture 2844.60 2930.50 0
2011-03-16 Multi-Stage Fracture 2770.30 2844.50 0
2011-03-16 Multi-Stage Fracture 2695.10 2770.20 0
2011-03-16 Multi-Stage Fracture 2630.70 2695.00 0
2011-02-13 Multi-Stage Fracture 3923.70 3933.00 0
2011-02-13 Multi-Stage Fracture 3868.40 3923.60 0
2011-02-13 Multi-Stage Fracture 3789.90 3868.30 0
2011-02-13 Multi-Stage Fracture 3714.60 3789.80 0
2011-02-13 Multi-Stage Fracture 3628.90 3714.50 0
2011-02-13 Multi-Stage Fracture 3552.90 3628.80 0
2011-02-13 Multi-Stage Fracture 3479.10 3552.90 0
2011-02-13 Multi-Stage Fracture 3393.10 3479.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7271 0.0 0.0 0.0
2012 8663 0.0 0.0 0.0
2013 8567 0.0 0.0 0.0
2014 8207 0.0 0.0 0.0
2015 8183 0.0 0.0 0.0
2016 7823 0.0 0.0 0.0
2017 6168 0.0 0.0 0.0
2018 7703 0.0 0.0 0.0
2019 8591 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-12-29 Lost Circulation 94.00 581.00

For data sources see[7]

References