If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595203304000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.15087,"lon":-116.935532,"icon":""}]} |
Location: 00/04-33-059-20W5/0 | |
Location Alias: 00/04-33-59-20 W5M | |
Location Alias 2: 00/04-33-059-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 20 | |
Section: 33 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: 2214896AB KAYBOBS 4-33-59-20 | |
Operator Name: 2214896 Alberta Ltd. | |
License Number: 0434448 | |
License Date: 2011-06-17 | |
License Status: Issued | |
Spud Date: 2011-10-16 | |
Final Drill Date: 2011-11-13 | |
Well Total Depth: 4190.00 m | |
Surface Hole Latitude: 54.150870 | |
Surface Hole Longitude: -116.935532 |
Date | Event |
---|---|
2011-06-17 | Obtained License |
2011-10-05 | Well Log Performed |
2011-10-12 | Well Log Performed |
2011-10-16 | Lost Circulation Occurred |
2011-10-17 | Lost Circulation Occurred |
2011-10-19 | Surface Casing Operation Performed |
2011-10-26 | Direction Drilling Operation Performed - Horizontal |
2011-10-26 | Well Log Performed |
2011-11-01 | Intermediate Casing Operation Performed |
2011-11-01 | Well Log Performed |
2011-11-02 | Well Log Performed |
2011-11-13 | Finished Drilling |
2011-11-13 | Well Mode changed to Drilled and Cased |
2011-11-16 | Liner Casing Operation Performed |
2011-11-16 | Perforation Treatment Performed - Open-Hole Completion |
2011-11-17 | Rig Released |
2011-11-17 | Well Log Performed |
2012-01-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-11 | Well Fluid changed to Gas |
2012-01-11 | Well Mode changed to Testing |
2012-01-21 | Well Fluid changed to Gas |
2012-01-21 | Well Mode changed to Test Completed |
2012-04-18 | Well Began Production |
2012-04-18 | Well Fluid changed to Gas |
2012-04-18 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-26 | 2134.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-16 | Open Hole/Barefoot Completion | 4180.00 | 4190.00 | 0 |
2012-01-11 | Multi-Stage Fracture | 3514.70 | 3515.20 | 0 |
2012-01-11 | Multi-Stage Fracture | 3423.00 | 3423.50 | 0 |
2012-01-11 | Multi-Stage Fracture | 3332.30 | 3332.80 | 0 |
2012-01-11 | Multi-Stage Fracture | 3255.70 | 3256.20 | 0 |
2012-01-11 | Multi-Stage Fracture | 3164.80 | 3165.30 | 0 |
2012-01-11 | Multi-Stage Fracture | 3017.30 | 3017.80 | 0 |
2012-01-11 | Multi-Stage Fracture | 2800.50 | 2801.00 | 0 |
2012-01-11 | Multi-Stage Fracture | 2682.10 | 2682.60 | 0 |
2012-01-11 | Multi-Stage Fracture | 2592.80 | 2593.30 | 0 |
2012-01-06 | Multi-Stage Fracture | 4157.10 | 4157.60 | 0 |
2012-01-06 | Multi-Stage Fracture | 4156.10 | 4156.60 | 0 |
2012-01-11 | Multi-Stage Fracture | 4062.80 | 4063.30 | 0 |
2012-01-11 | Multi-Stage Fracture | 3971.00 | 3971.50 | 0 |
2012-01-11 | Multi-Stage Fracture | 3879.70 | 3880.20 | 0 |
2012-01-11 | Multi-Stage Fracture | 3788.20 | 3788.70 | 0 |
2012-01-11 | Multi-Stage Fracture | 3696.90 | 3697.40 | 0 |
2012-01-11 | Multi-Stage Fracture | 3605.70 | 3606.20 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6049 | 0.0 | 0.0 | 0.0 |
2013 | 8623 | 0.0 | 0.0 | 0.0 |
2014 | 8572 | 0.0 | 0.0 | 0.0 |
2015 | 8256 | 0.0 | 0.0 | 0.0 |
2016 | 7666 | 0.0 | 0.0 | 0.0 |
2017 | 5465 | 0.0 | 0.0 | 0.0 |
2018 | 7012 | 0.0 | 0.0 | 0.0 |
2019 | 8521 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2011-10-16 | Lost Circulation | 30.00 | 168.00 |
2011-10-17 | Lost Circulation | 178.00 | 189.00 |
For data sources see[7]