X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595203101000

Well Details

Well ID: 0595203101000
Loading map...
Location: 00/01-31-059-20W5/0
Location Alias: 00/01-31-59-20 W5M
Location Alias 2: 00/01-31-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 31
County/Municipality: Municipal District of Greenview No. 16
Well Name: 2214896AB HZ KAYBOBS 1-31-59-20
Operator Name: 2214896 Alberta Ltd.
License Number: 0497416
License Date: 2020-01-16
License Status: Issued
Spud Date: 2020-02-07
Final Drill Date: 2020-02-19
Well Total Depth: 3233.00 m
Surface Hole Latitude: 54.151780
Surface Hole Longitude: -116.977707

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-02-07 Lasso Drilling Corporation 2 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-10 472.50 Deviate (5 - 79 degrees)
2020-02-18 1788.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-03-03 Multi-Stage Fracture 3190.70 3190.80 0
2020-03-03 Multi-Stage Fracture 2790.30 2790.40 0
2020-03-03 Multi-Stage Fracture 2746.30 2746.40 0
2020-03-03 Multi-Stage Fracture 2704.80 2704.90 0
2020-03-03 Multi-Stage Fracture 2660.60 2660.70 0
2020-03-03 Multi-Stage Fracture 2617.80 2617.90 0
2020-03-03 Multi-Stage Fracture 2574.10 2574.20 0
2020-03-03 Multi-Stage Fracture 2529.50 2529.60 0
2020-03-03 Multi-Stage Fracture 2485.70 2485.80 0
2020-03-03 Multi-Stage Fracture 2443.30 2443.40 0
2020-03-03 Multi-Stage Fracture 2398.20 2398.30 0
2020-03-03 Multi-Stage Fracture 3144.60 3144.70 0
2020-03-03 Multi-Stage Fracture 2355.10 2355.20 0
2020-03-03 Multi-Stage Fracture 2311.10 2311.20 0
2020-03-03 Multi-Stage Fracture 2268.70 2268.80 0
2020-03-03 Multi-Stage Fracture 2223.60 2223.70 0
2020-03-03 Multi-Stage Fracture 2180.50 2180.60 0
2020-03-03 Multi-Stage Fracture 2137.30 2137.40 0
2020-03-03 Multi-Stage Fracture 2095.40 2095.50 0
2020-03-03 Multi-Stage Fracture 2051.20 2051.30 0
2020-03-03 Multi-Stage Fracture 2008.70 2008.80 0
2020-03-03 Multi-Stage Fracture 1963.50 1963.60 0
2020-03-03 Multi-Stage Fracture 3100.30 3100.40 0
2020-03-03 Multi-Stage Fracture 1919.30 1919.40 0
2020-03-03 Multi-Stage Fracture 1874.00 1874.10 0
2020-03-03 Perforation 3190.70 3190.80 1
2020-03-03 Perforation 3144.60 3144.70 1
2020-03-03 Perforation 3100.30 3100.40 1
2020-03-03 Perforation 3055.90 3056.00 1
2020-03-03 Perforation 3012.20 3012.30 1
2020-03-03 Perforation 2968.10 2968.20 1
2020-03-03 Perforation 2924.00 2924.10 1
2020-03-03 Perforation 2878.60 2878.70 1
2020-03-03 Multi-Stage Fracture 3055.90 3056.00 0
2020-03-03 Perforation 2834.60 2834.70 1
2020-03-03 Perforation 2790.30 2790.40 1
2020-03-03 Perforation 2746.30 2746.40 1
2020-03-03 Perforation 2704.80 2704.90 1
2020-03-03 Perforation 2660.60 2660.70 1
2020-03-03 Perforation 2617.80 2617.90 1
2020-03-03 Perforation 2574.10 2574.20 1
2020-03-03 Perforation 2529.50 2529.60 1
2020-03-03 Perforation 2485.70 2485.80 1
2020-03-03 Perforation 2443.30 2443.40 1
2020-03-03 Multi-Stage Fracture 3012.20 3012.30 0
2020-03-03 Perforation 2398.20 2398.30 1
2020-03-03 Perforation 2355.10 2355.20 1
2020-03-03 Perforation 2311.10 2311.20 1
2020-03-03 Perforation 2268.70 2268.80 1
2020-03-03 Perforation 2223.60 2223.70 1
2020-03-03 Perforation 2180.50 2180.60 1
2020-03-03 Perforation 2137.30 2137.40 1
2020-03-03 Perforation 2095.40 2095.50 1
2020-03-03 Perforation 2051.20 2051.30 1
2020-03-03 Perforation 2008.70 2008.80 1
2020-03-03 Multi-Stage Fracture 2968.10 2968.20 0
2020-03-03 Perforation 1963.50 1963.60 1
2020-03-03 Perforation 1919.30 1919.40 1
2020-03-03 Perforation 1874.00 1874.10 1
2020-03-03 Multi-Stage Fracture 2924.00 2924.10 0
2020-03-03 Multi-Stage Fracture 2878.60 2878.70 0
2020-03-03 Multi-Stage Fracture 2834.60 2834.70 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-09 Lost Circulation 60.00 159.00
2020-03-20 No Incident Encountered 0.00 0.00
2020-03-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References