X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595202815000

Well Details

Well ID: 0595202815000
Loading map...
Location: 00/15-28-059-20W5/0
Location Alias: 00/15-28-59-20 W5M
Location Alias 2: 00/15-28-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY FIR 15-28-59-20
Operator Name: Paramount Resources Ltd.
License Number: 0416092
License Date: 2009-12-22
License Status: Issued
Spud Date: 2010-01-21
Final Drill Date: 2010-02-18
Well Total Depth: 4061.00 m
Surface Hole Latitude: 54.120303
Surface Hole Longitude: -116.932631

For data sources see[1][2]

Well History

Date Event
2009-12-22 Obtained License
2010-01-24 Surface Casing Operation Performed
2010-01-29 Direction Drilling Operation Performed - Horizontal
2010-02-07 Intermediate Casing Operation Performed
2010-02-18 Finished Drilling
2010-02-18 Well Log Performed
2010-02-18 Well Mode changed to Drilled and Cased
2010-02-19 Well Log Performed
2010-02-23 Perforation Treatment Performed - Open-Hole Completion
2010-02-23 Rig Released
2010-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2010-03-26 Well Began Production
2010-03-26 Well Fluid changed to Gas
2010-03-26 Well Mode changed to Flowing
2012-12-12 Well Fluid changed to Gas
2012-12-12 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-01-29 2207.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-23 Open Hole/Barefoot Completion 2702.00 4061.00 0
2010-03-06 Multi-Stage Fracture 3694.80 3694.90 0
2010-03-06 Multi-Stage Fracture 3796.30 3796.40 0
2010-03-06 Multi-Stage Fracture 3880.30 3880.40 0
2010-03-06 Multi-Stage Fracture 3978.00 3978.10 0
2010-03-06 Multi-Stage Fracture 3016.80 3090.10 0
2010-03-06 Multi-Stage Fracture 3090.00 3090.10 0
2010-03-06 Multi-Stage Fracture 3176.00 3176.10 0
2010-03-06 Multi-Stage Fracture 3264.20 3264.30 0
2010-03-06 Multi-Stage Fracture 3326.00 3326.10 0
2010-03-06 Multi-Stage Fracture 3435.10 3435.20 0
2010-03-06 Multi-Stage Fracture 3548.80 3548.90 0
2010-03-06 Multi-Stage Fracture 3634.80 3634.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5914 0.0 0.0 0.0
2011 7871 0.0 0.0 0.0
2012 7720 0.0 0.0 0.0
2013 8567 0.0 0.0 0.0
2014 7319 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 6815 0.0 0.0 0.0
2018 8615 0.0 0.0 0.0
2019 8363 0.0 0.0 0.0
2020 1847 0.0 0.0 0.0

For data sources see[6]

References