X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595202713000

Well Details

Well ID: 0595202713000
Loading map...
Location: 00/13-27-059-20W5/0
Location Alias: 00/13-27-59-20 W5M
Location Alias 2: 00/13-27-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY FIR 13-27-59-20
Operator Name: Paramount Resources Ltd.
License Number: 0417943
License Date: 2010-01-26
License Status: Issued
Spud Date: 2010-05-19
Final Drill Date: 2010-06-12
Well Total Depth: 4417.00 m
Surface Hole Latitude: 54.120115
Surface Hole Longitude: -116.932303

For data sources see[1][2]

Well History

Date Event
2010-01-26 Obtained License
2010-05-21 Surface Casing Operation Performed
2010-05-24 Direction Drilling Operation Performed - Horizontal
2010-06-03 Well Log Performed
2010-06-04 Intermediate Casing Operation Performed
2010-06-12 Finished Drilling
2010-06-12 Well Log Performed
2010-06-12 Well Mode changed to Drilled and Cased
2010-06-30 Perforation Treatment Performed - Open-Hole Completion
2010-06-30 Rig Released
2010-07-11 Perforation Treatment Performed - Multi-Stage Fracture
2010-07-18 Well Began Production
2010-07-18 Well Fluid changed to Gas
2010-07-18 Well Mode changed to Flowing
2010-07-30 Well Log Performed
2016-02-19 Well Fluid changed to Gas
2016-02-19 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-05-24 1934.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-06-30 Open Hole/Barefoot Completion 3008.00 4417.00 0
2010-07-11 Multi-Stage Fracture 3823.40 3823.50 0
2010-07-11 Multi-Stage Fracture 3957.40 3957.50 0
2010-07-11 Multi-Stage Fracture 4067.50 4067.60 0
2010-07-11 Multi-Stage Fracture 4184.60 4184.70 0
2010-07-11 Multi-Stage Fracture 4282.70 4282.80 0
2010-07-11 Multi-Stage Fracture 4355.00 4355.10 0
2010-07-11 Multi-Stage Fracture 3077.60 3077.70 0
2010-07-11 Multi-Stage Fracture 3135.20 3135.30 0
2010-07-11 Multi-Stage Fracture 3257.00 3257.10 0
2010-07-11 Multi-Stage Fracture 3338.80 3338.90 0
2010-07-11 Multi-Stage Fracture 3465.30 3465.40 0
2010-07-11 Multi-Stage Fracture 3549.40 3549.50 0
2010-07-11 Multi-Stage Fracture 3628.70 3628.80 0
2010-07-11 Multi-Stage Fracture 3749.50 3749.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 3769 0.0 0.0 0.0
2011 7933 0.0 0.0 0.0
2012 8339 0.0 0.0 0.0
2013 8687 0.0 0.0 0.0
2014 7367 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 6887 0.0 0.0 0.0
2018 7895 0.0 0.0 0.0
2019 8581 0.0 0.0 0.0
2020 2160 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-07-21 No Incident Encountered 0.00 0.00

For data sources see[7]

References