X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595202515000

Well Details

Well ID: 0595202515000
Loading map...
Location: 00/15-25-059-20W5/0
Location Alias: 00/15-25-59-20 W5M
Location Alias 2: 00/15-25-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 15-25-59-20
Operator Name: Paramount Resources Ltd.
License Number: 0435654
License Date: 2011-08-03
License Status: Amended
Spud Date: 2011-11-20
Final Drill Date: 2011-12-27
Well Total Depth: 5606.00 m
Surface Hole Latitude: 54.108356
Surface Hole Longitude: -116.868302

For data sources see[1][2]

Well History

Date Event
2011-08-03 Obtained License
2011-11-20 Lost Circulation Occurred
2011-11-21 Lost Circulation Occurred
2011-11-24 Surface Casing Operation Performed
2011-12-05 Direction Drilling Operation Performed - Horizontal
2011-12-09 Intermediate Casing Operation Performed
2011-12-27 Finished Drilling
2011-12-27 Well Log Performed
2011-12-27 Well Mode changed to Drilled and Cased
2012-01-08 Liner Casing Operation Performed
2012-01-08 Rig Released
2012-01-14 Well Log Performed
2012-01-18 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-18 Perforation Treatment Performed - Open-Hole Completion
2012-01-22 Well Began Production
2012-01-22 Well Fluid changed to Gas
2012-01-22 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-05 2650.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-18 Open Hole/Barefoot Completion 5599.00 5606.00 0
2012-01-18 Multi-Stage Fracture 4872.80 4964.30 0
2012-01-18 Multi-Stage Fracture 4782.80 4872.70 0
2012-01-18 Multi-Stage Fracture 4691.80 4782.70 0
2012-01-18 Multi-Stage Fracture 4604.20 4691.70 0
2012-01-18 Multi-Stage Fracture 4516.70 4604.10 0
2012-01-18 Multi-Stage Fracture 4428.10 4516.60 0
2012-01-18 Multi-Stage Fracture 4329.10 4428.00 0
2012-01-18 Multi-Stage Fracture 4241.50 4329.00 0
2012-01-18 Multi-Stage Fracture 4154.00 4241.40 0
2012-01-18 Multi-Stage Fracture 4070.80 4153.90 0
2012-01-18 Multi-Stage Fracture 5586.30 5606.00 0
2012-01-18 Multi-Stage Fracture 3983.20 4070.70 0
2012-01-18 Multi-Stage Fracture 3893.60 3983.10 0
2012-01-18 Multi-Stage Fracture 3795.50 3893.50 0
2012-01-18 Multi-Stage Fracture 3708.10 3795.40 0
2012-01-18 Multi-Stage Fracture 3627.00 3708.00 0
2012-01-18 Multi-Stage Fracture 3536.40 3626.90 0
2012-01-18 Multi-Stage Fracture 3447.50 3536.30 0
2012-01-18 Multi-Stage Fracture 3354.00 3447.40 0
2012-01-18 Multi-Stage Fracture 3253.20 3353.90 0
2012-01-18 Multi-Stage Fracture 3164.50 3253.30 0
2012-01-18 Multi-Stage Fracture 5522.00 5586.20 0
2012-01-18 Multi-Stage Fracture 3085.00 3164.40 0
2012-01-18 Multi-Stage Fracture 3021.10 3084.90 0
2012-01-18 Multi-Stage Fracture 5434.60 5521.90 0
2012-01-18 Multi-Stage Fracture 5344.30 5434.50 0
2012-01-18 Multi-Stage Fracture 5245.50 5344.20 0
2012-01-18 Multi-Stage Fracture 5155.40 5245.40 0
2012-01-18 Multi-Stage Fracture 5065.20 5155.30 0
2012-01-18 Multi-Stage Fracture 4964.40 5065.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 8111 0.0 0.0 0.0
2013 8663 0.0 0.0 0.0
2014 8135 0.0 0.0 0.0
2015 8615 0.0 0.0 0.0
2016 6455 0.0 0.0 0.0
2017 6719 0.0 0.0 0.0
2018 6072 0.0 0.0 0.0
2019 3576 0.0 0.0 0.0
2020 2039 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-11-20 Lost Circulation 154.00 176.00
2011-11-21 Lost Circulation 176.00 294.00
2012-07-12 No Incident Encountered 0.00 0.00

For data sources see[7]

References