X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595202314000

Well Details

Well ID: 0595202314000
Loading map...
Location: 00/14-23-059-20W5/0
Location Alias: 00/14-23-59-20 W5M
Location Alias 2: 00/14-23-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 23
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 14-23-59-20
Operator Name: Paramount Resources Ltd.
License Number: 0422183
License Date: 2010-07-27
License Status: Issued
Spud Date: 2010-10-07
Final Drill Date: 2010-11-01
Well Total Depth: 4053.00 m
Surface Hole Latitude: 54.108703
Surface Hole Longitude: -116.888063

For data sources see[1][2]

Well History

Date Event
2010-07-27 Obtained License
2010-10-10 Surface Casing Operation Performed
2010-10-16 Direction Drilling Operation Performed - Horizontal
2010-10-23 Intermediate Casing Operation Performed
2010-10-31 Well Log Performed
2010-11-01 Finished Drilling
2010-11-01 Well Mode changed to Drilled and Cased
2010-11-03 Well Log Performed
2010-11-05 Production Casing Operation Performed
2010-11-06 Liner Casing Operation Performed
2010-11-07 Rig Released
2010-11-15 Well Log Performed
2010-11-17 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-17 Perforation Treatment Performed - Open-Hole Completion
2010-11-25 Well Log Performed
2010-12-20 Well Began Production
2010-12-20 Well Fluid changed to Gas
2010-12-20 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-16 2355.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-17 Open Hole/Barefoot Completion 4049.00 4053.00 0
2010-11-17 Multi-Stage Fracture 3444.90 3523.60 0
2010-11-17 Multi-Stage Fracture 3366.00 3444.80 0
2010-11-17 Multi-Stage Fracture 3299.90 3365.90 0
2010-11-17 Multi-Stage Fracture 3221.90 3299.80 0
2010-11-17 Multi-Stage Fracture 3156.00 3221.80 0
2010-11-17 Multi-Stage Fracture 3078.00 3155.90 0
2010-11-17 Multi-Stage Fracture 3001.30 3077.90 0
2010-11-17 Multi-Stage Fracture 2923.80 3001.20 0
2010-11-17 Multi-Stage Fracture 2857.10 2923.70 0
2010-11-17 Multi-Stage Fracture 2780.80 2857.00 0
2010-11-17 Multi-Stage Fracture 4015.40 4049.00 0
2010-11-17 Multi-Stage Fracture 2715.70 2780.70 0
2010-11-17 Multi-Stage Fracture 2651.50 2715.60 0
2010-11-17 Multi-Stage Fracture 3958.70 4015.30 0
2010-11-17 Multi-Stage Fracture 3891.60 3958.60 0
2010-11-17 Multi-Stage Fracture 3812.90 3891.50 0
2010-11-17 Multi-Stage Fracture 3735.40 3812.80 0
2010-11-17 Multi-Stage Fracture 3669.50 3735.30 0
2010-11-17 Multi-Stage Fracture 3590.70 3669.40 0
2010-11-17 Multi-Stage Fracture 3523.70 3590.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 261 0.0 0.0 0.0
2011 8184 0.0 0.0 0.0
2012 7705 0.0 0.0 0.0
2013 7871 0.0 0.0 0.0
2014 5904 0.0 0.0 0.0
2015 7919 0.0 0.0 0.0
2016 7872 0.0 0.0 0.0
2017 6984 0.0 0.0 0.0
2018 7872 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 720 0.0 0.0 0.0

For data sources see[6]

References