If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595201404002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.11047,"lon":-116.895402,"icon":""}]} |
Location: 00/04-14-059-20W5/2 | |
Location Alias: 00/04-14-59-20 W5M | |
Location Alias 2: 00/04-14-059-20 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 20 | |
Section: 14 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TALISMAN ET AL HZ KAYBOBS 4-14-59-20 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0446489 | |
License Date: 2012-06-13 | |
License Status: Abandoned | |
Spud Date: 2012-07-22 | |
Final Drill Date: 2012-08-17 | |
Well Total Depth: 3381.00 m | |
Surface Hole Latitude: 54.110470 | |
Surface Hole Longitude: -116.895402 |
Date | Event |
---|---|
2012-06-13 | Obtained License |
2012-07-24 | Surface Casing Operation Performed |
2012-07-27 | Direction Drilling Operation Performed - Deviate |
2012-07-30 | Direction Drilling Operation Performed - Horizontal |
2012-08-02 | Intermediate Casing Operation Performed |
2012-08-10 | Direction Drilling Operation Performed - Horizontal |
2012-08-10 | Well Log Performed |
2012-08-17 | Finished Drilling |
2012-08-17 | Perforation Treatment Performed - Open-Hole Completion |
2012-08-17 | Well Log Performed |
2012-08-17 | Well Mode changed to Drilled and Cased |
2012-08-18 | Well Log Performed |
2012-08-20 | Production Casing Operation Performed |
2012-08-21 | Rig Released |
2012-09-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-01-01 | Well Began Production |
2013-01-01 | Well Fluid changed to Crude Oil |
2013-01-01 | Well Mode changed to Pumping |
2014-02-18 | Well Fluid changed to Crude Oil |
2014-02-18 | Well Mode changed to Suspended |
2014-06-01 | Well Fluid changed to Crude Oil |
2014-06-01 | Well Mode changed to Pumping |
2015-03-01 | Well Fluid changed to Crude Oil |
2015-03-01 | Well Mode changed to Suspended |
2016-10-19 | Well Fluid changed to Crude Oil |
2016-10-19 | Well Mode changed to Pumping |
2016-10-20 | Well Fluid changed to Crude Oil |
2016-10-20 | Well Mode changed to Suspended |
2016-10-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-10-21 | Plug Back Performed |
2016-10-21 | Well Fluid changed to Crude Oil |
2016-10-21 | Well Mode changed to Abandoned Zone |
2016-12-06 | Well Abandoned |
2016-12-06 | Well Fluid changed to Crude Oil |
2016-12-06 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-07-27 | 1412.00 | Deviate (5 - 79 degrees) |
2012-07-30 | 1887.00 | Horizontal |
2012-08-10 | 1930.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-17 | Open Hole/Barefoot Completion | 3373.00 | 3381.00 | 0 |
2012-09-05 | Multi-Stage Fracture | 2559.00 | 2559.40 | 0 |
2012-09-05 | Multi-Stage Fracture | 2452.60 | 2453.00 | 0 |
2012-09-05 | Multi-Stage Fracture | 2345.10 | 2345.50 | 0 |
2012-09-05 | Multi-Stage Fracture | 2261.20 | 2261.70 | 0 |
2012-09-05 | Multi-Stage Fracture | 2152.60 | 2153.00 | 0 |
2012-09-05 | Multi-Stage Fracture | 2056.40 | 2056.80 | 0 |
2012-09-05 | Multi-Stage Fracture | 1973.10 | 1973.50 | 0 |
2016-10-21 | Packing Device Capped w/Cement | 1733.00 | 1781.00 | 0 |
2012-09-04 | Multi-Stage Fracture | 3343.50 | 3343.80 | 0 |
2012-09-04 | Multi-Stage Fracture | 3258.90 | 3259.30 | 0 |
2012-09-04 | Multi-Stage Fracture | 3150.80 | 3151.20 | 0 |
2012-09-04 | Multi-Stage Fracture | 3042.10 | 3042.50 | 0 |
2012-09-04 | Multi-Stage Fracture | 2957.30 | 2957.70 | 0 |
2012-09-04 | Multi-Stage Fracture | 2860.50 | 2860.90 | 0 |
2012-09-05 | Multi-Stage Fracture | 2763.50 | 2763.90 | 0 |
2012-09-05 | Multi-Stage Fracture | 2667.00 | 2667.40 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 7143 | 0.0 | 0.0 | 0.0 |
2014 | 24 | 0.0 | 0.0 | 0.0 |
2016 | 1 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-21 | No Incident Encountered | 0.00 | 0.00 |
2012-09-17 | No Incident Encountered | 0.00 | 0.00 |
2016-10-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]