X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595201214000

Well Details

Well ID: 0595201214000
Loading map...
Location: 00/14-12-059-20W5/0
Location Alias: 00/14-12-59-20 W5M
Location Alias 2: 00/14-12-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 12
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 14-12-59-20
Operator Name: Paramount Resources Ltd.
License Number: 0418252
License Date: 2010-02-02
License Status: Issued
Spud Date: 2010-02-06
Final Drill Date: 2010-03-07
Well Total Depth: 3731.00 m
Surface Hole Latitude: 54.080950
Surface Hole Longitude: -116.864019

For data sources see[1][2]

Well History

Date Event
2010-02-02 Obtained License
2010-02-07 Lost Circulation Occurred
2010-02-10 Surface Casing Operation Performed
2010-02-11 Lost Circulation Occurred
2010-02-14 Direction Drilling Operation Performed - Horizontal
2010-03-01 Intermediate Casing Operation Performed
2010-03-07 Finished Drilling
2010-03-07 Well Log Performed
2010-03-07 Well Mode changed to Drilled and Cased
2010-03-10 Intermediate Casing Operation Performed
2010-03-11 Liner Casing Operation Performed
2010-03-12 Rig Released
2010-03-16 Well Log Performed
2010-03-19 Perforation Treatment Performed - Multi-Stage Fracture
2010-03-19 Perforation Treatment Performed - Open-Hole Completion
2010-05-29 Well Began Production
2010-05-29 Well Fluid changed to Gas
2010-05-29 Well Mode changed to Flowing
2019-01-01 Well Fluid changed to Gas
2019-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-14 2701.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-19 Open Hole/Barefoot Completion 3726.00 3731.00 0
2010-03-19 Multi-Stage Fracture 2942.00 2942.10 0
2010-03-19 Multi-Stage Fracture 2845.80 2845.90 0
2010-03-19 Multi-Stage Fracture 2775.80 2775.90 0
2010-03-19 Multi-Stage Fracture 3691.40 3691.50 0
2010-03-19 Multi-Stage Fracture 3618.70 3618.80 0
2010-03-19 Multi-Stage Fracture 3524.90 3525.00 0
2010-03-19 Multi-Stage Fracture 3430.00 3430.10 0
2010-03-19 Multi-Stage Fracture 3335.10 3335.20 0
2010-03-19 Multi-Stage Fracture 3239.00 3239.10 0
2010-03-19 Multi-Stage Fracture 3144.80 3144.90 0
2010-03-19 Multi-Stage Fracture 3036.90 3037.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5016 0.0 0.0 0.0
2011 8303 0.0 0.0 0.0
2012 8615 0.0 0.0 0.0
2013 8591 0.0 0.0 0.0
2014 7296 0.0 0.0 0.0
2015 8375 0.0 0.0 0.0
2016 7439 0.0 0.0 0.0
2017 5447 0.0 0.0 0.0
2018 7319 0.0 0.0 0.0
2019 8135 0.0 0.0 0.0
2020 1871 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-02-07 Lost Circulation 49.00 580.00
2010-02-11 Lost Circulation 580.00 3731.00
2011-01-09 No Incident Encountered 0.00 0.00

For data sources see[7]

References