X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595200804000

Well Details

Well ID: 0595200804000
Loading map...
Location: 00/04-08-059-20W5/0
Location Alias: 00/04-08-59-20 W5M
Location Alias 2: 00/04-08-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 08
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ FIR 4-8-59-20
Operator Name: Paramount Resources Ltd.
License Number: 0441982
License Date: 2011-12-22
License Status: Issued
Spud Date: 2012-01-16
Final Drill Date: 2012-02-17
Well Total Depth: 4183.00 m
Surface Hole Latitude: 54.081403
Surface Hole Longitude: -116.947313

For data sources see[1][2]

Well History

Date Event
2011-12-22 Obtained License
2012-01-19 Surface Casing Operation Performed
2012-02-05 Intermediate Casing Operation Performed
2012-02-08 Well Log Performed
2012-02-12 Direction Drilling Operation Performed - Horizontal
2012-02-17 Finished Drilling
2012-02-17 Well Log Performed
2012-02-17 Well Mode changed to Drilled and Cased
2012-02-19 Liner Casing Operation Performed
2012-02-20 Rig Released
2012-02-26 Well Log Performed
2012-02-28 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-28 Perforation Treatment Performed - Open-Hole Completion
2012-03-17 Well Began Production
2012-03-17 Well Fluid changed to Gas
2012-03-17 Well Mode changed to Flowing
2018-02-09 Well Fluid changed to Gas
2018-02-09 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-16 Precision Drilling Corporation 225 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-12 2872.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-28 Open Hole/Barefoot Completion 4177.00 4183.00 0
2012-02-28 Multi-Stage Fracture 3616.10 3686.80 0
2012-02-28 Multi-Stage Fracture 3531.90 3616.00 0
2012-02-28 Multi-Stage Fracture 3460.60 3531.80 0
2012-02-28 Multi-Stage Fracture 3388.50 3460.50 0
2012-02-28 Multi-Stage Fracture 3318.40 3388.40 0
2012-02-28 Multi-Stage Fracture 3234.80 3318.30 0
2012-02-28 Multi-Stage Fracture 3165.30 3234.70 0
2012-02-28 Multi-Stage Fracture 3093.30 3165.20 0
2012-02-28 Multi-Stage Fracture 3023.20 3093.20 0
2012-02-28 Multi-Stage Fracture 2965.20 3023.10 0
2012-02-28 Multi-Stage Fracture 4167.60 4183.00 0
2012-02-28 Multi-Stage Fracture 4132.80 4167.50 0
2012-02-28 Multi-Stage Fracture 4048.90 4132.70 0
2012-02-28 Multi-Stage Fracture 3976.00 4048.80 0
2012-02-28 Multi-Stage Fracture 3903.30 3975.90 0
2012-02-28 Multi-Stage Fracture 3831.10 3903.20 0
2012-02-28 Multi-Stage Fracture 3758.70 3831.00 0
2012-02-28 Multi-Stage Fracture 3686.90 3758.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5424 0.0 0.0 0.0
2013 7920 0.0 0.0 0.0
2014 6887 0.0 0.0 0.0
2015 5255 0.0 0.0 0.0
2016 3743 0.0 0.0 0.0
2017 2184 0.0 0.0 0.0
2018 5663 0.0 0.0 0.0
2019 5663 0.0 0.0 0.0
2020 1296 0.0 0.0 0.0

For data sources see[7]

References