X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595200508000

Well Details

Well ID: 0595200508000
Loading map...
Location: 00/08-05-059-20W5/0
Location Alias: 00/08-05-59-20 W5M
Location Alias 2: 00/08-05-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY ET AL HZ FIR 8-5-59-20
Operator Name: Paramount Resources Ltd.
License Number: 0431283
License Date: 2011-02-07
License Status: Issued
Spud Date: 2011-02-14
Final Drill Date: 2011-04-01
Well Total Depth: 4592.00 m
Surface Hole Latitude: 54.066956
Surface Hole Longitude: -116.979896

For data sources see[1][2]

Well History

Date Event
2011-02-07 Obtained License
2011-02-18 Surface Casing Operation Performed
2011-02-26 Well Log Performed
2011-03-06 Direction Drilling Operation Performed - Horizontal
2011-03-19 Intermediate Casing Operation Performed
2011-04-01 Finished Drilling
2011-04-01 Well Mode changed to Drilled and Cased
2011-04-04 Liner Casing Operation Performed
2011-04-06 Rig Released
2011-08-01 Well Log Performed
2011-08-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-03 Perforation Treatment Performed - Open-Hole Completion
2011-08-07 Well Began Production
2011-08-07 Well Fluid changed to Gas
2011-08-07 Well Mode changed to Flowing
2014-05-06 Well Fluid changed to Gas
2014-05-06 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-03-06 2776.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-03 Open Hole/Barefoot Completion 3264.30 4592.00 0
2011-08-03 Multi-Stage Fracture 3991.00 3991.10 0
2011-08-03 Multi-Stage Fracture 3915.70 3915.80 0
2011-08-03 Multi-Stage Fracture 3840.50 3840.60 0
2011-08-03 Multi-Stage Fracture 3764.90 3765.00 0
2011-08-03 Multi-Stage Fracture 3689.60 3689.70 0
2011-08-03 Multi-Stage Fracture 3614.40 3614.50 0
2011-08-03 Multi-Stage Fracture 3539.00 3539.10 0
2011-08-03 Multi-Stage Fracture 3463.90 3464.00 0
2011-08-03 Multi-Stage Fracture 3389.30 3389.40 0
2011-08-03 Multi-Stage Fracture 3315.40 3315.50 0
2011-08-03 Multi-Stage Fracture 4567.00 4567.10 0
2011-08-03 Multi-Stage Fracture 3264.30 3264.40 0
2011-08-03 Multi-Stage Fracture 4512.90 4513.00 0
2011-08-03 Multi-Stage Fracture 4438.00 4438.10 0
2011-08-03 Multi-Stage Fracture 4363.50 4363.60 0
2011-08-03 Multi-Stage Fracture 4289.40 4289.50 0
2011-08-03 Multi-Stage Fracture 4215.20 4215.30 0
2011-08-03 Multi-Stage Fracture 4141.00 4141.10 0
2011-08-03 Multi-Stage Fracture 4065.90 4066.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 3115 0.0 0.0 0.0
2012 8160 0.0 0.0 0.0
2013 7584 0.0 0.0 0.0
2014 5087 0.0 0.0 0.0
2015 8591 0.0 0.0 0.0
2016 7655 0.0 0.0 0.0
2017 6024 0.0 0.0 0.0
2018 8087 0.0 0.0 0.0
2019 7437 0.0 0.0 0.0
2020 960 0.0 0.0 0.0

For data sources see[6]

References