X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595193316000

Well Details

Well ID: 0595193316000
Loading map...
Location: 00/16-33-059-19W5/0
Location Alias: 00/16-33-59-19 W5M
Location Alias 2: 00/16-33-059-19 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 19
Section: 33
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC ET AL HZ KAYBOBS 16-33-59-19
Operator Name: XTO Energy Canada ULC
License Number: 0445727
License Date: 2012-05-08
License Status: Issued
Spud Date: 2012-07-11
Final Drill Date: 2012-08-23
Well Total Depth: 4931.00 m
Surface Hole Latitude: 54.135763
Surface Hole Longitude: -116.773649

For data sources see[1][2]

Well History

Date Event
2012-05-08 Obtained License
2012-07-14 Surface Casing Operation Performed
2012-08-03 Direction Drilling Operation Performed - Deviate
2012-08-07 Well Log Performed
2012-08-09 Production Casing Operation Performed
2012-08-12 Direction Drilling Operation Performed - Horizontal
2012-08-23 Finished Drilling
2012-08-23 Well Log Performed
2012-08-23 Well Mode changed to Drilled and Cased
2012-08-26 Liner Casing Operation Performed
2012-08-26 Perforation Treatment Performed - Open-Hole Completion
2012-08-27 Rig Released
2012-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-01 Well Fluid changed to Gas
2012-11-01 Well Mode changed to Testing
2012-11-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-24 Well Log Performed
2013-01-12 Well Began Production
2013-01-12 Well Fluid changed to Shale Gas Only
2013-01-12 Well Mode changed to Flowing
2016-06-01 Well Fluid changed to Shale Gas Only
2016-06-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-07-11 Chinook Drilling Inc. 5 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-03 3157.40 Deviate (5 - 79 degrees)
2012-08-12 3380.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-26 Open Hole/Barefoot Completion 4927.80 4931.00 0
2012-10-30 Multi-Stage Fracture 4417.90 4431.20 0
2012-10-30 Multi-Stage Fracture 4355.70 4369.00 0
2012-10-30 Multi-Stage Fracture 4287.30 4300.60 0
2012-10-31 Multi-Stage Fracture 4225.10 4232.40 0
2012-10-31 Multi-Stage Fracture 4169.30 4182.60 0
2012-10-31 Multi-Stage Fracture 4100.80 4114.10 0
2012-10-31 Multi-Stage Fracture 4025.90 4051.80 0
2012-10-31 Multi-Stage Fracture 3970.10 3988.40 0
2012-10-31 Multi-Stage Fracture 3901.70 3915.00 0
2012-11-01 Multi-Stage Fracture 3826.80 3840.10 0
2012-10-27 Multi-Stage Fracture 4918.20 4919.50 0
2012-11-01 Multi-Stage Fracture 3771.00 3784.30 0
2012-11-01 Multi-Stage Fracture 3702.60 3715.90 0
2012-11-01 Multi-Stage Fracture 3628.40 3630.10 0
2012-11-14 Multi-Stage Fracture 3569.30 3571.00 0
2012-11-14 Multi-Stage Fracture 3509.80 3511.40 0
2012-11-14 Multi-Stage Fracture 3437.60 3439.20 0
2012-11-15 Multi-Stage Fracture 3378.00 3379.70 0
2012-11-15 Multi-Stage Fracture 3331.10 3332.80 0
2012-10-28 Multi-Stage Fracture 4866.40 4868.10 0
2012-10-28 Multi-Stage Fracture 4794.80 4796.40 0
2012-10-29 Multi-Stage Fracture 4734.60 4747.90 0
2012-10-29 Multi-Stage Fracture 4679.10 4692.10 0
2012-10-29 Multi-Stage Fracture 4604.20 4617.50 0
2012-10-29 Multi-Stage Fracture 4548.50 4561.80 0
2012-10-30 Multi-Stage Fracture 4486.30 4499.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 65 0.0 0.0 0.0
2013 7105 0.0 0.0 0.0
2014 8101 0.0 0.0 0.0
2015 7791 0.0 0.0 0.0
2016 7142 0.0 0.0 0.0
2017 7570 0.0 0.0 0.0
2018 6947 0.0 0.0 0.0
2019 6819 0.0 0.0 0.0
2020 1749 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-26 No Incident Encountered 0.00 0.00
2012-11-24 No Incident Encountered 0.00 0.00

For data sources see[8]

References