If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595193104000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.13797,"lon":-116.822629,"icon":""}]} |
Location: 00/04-31-059-19W5/0 | |
Location Alias: 00/04-31-59-19 W5M | |
Location Alias 2: 00/04-31-059-19 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 19 | |
Section: 31 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TRILOGY HZ KAYBOBS 4-31-59-19 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0422309 | |
License Date: 2010-07-30 | |
License Status: Issued | |
Spud Date: 2010-11-10 | |
Final Drill Date: 2010-12-06 | |
Well Total Depth: 4175.00 m | |
Surface Hole Latitude: 54.137970 | |
Surface Hole Longitude: -116.822629 |
Date | Event |
---|---|
2010-07-30 | Obtained License |
2010-11-10 | Surface Casing Operation Performed |
2010-11-10 | Well Log Performed |
2010-11-25 | Direction Drilling Operation Performed - Horizontal |
2010-11-27 | Intermediate Casing Operation Performed |
2010-12-06 | Finished Drilling |
2010-12-06 | Well Mode changed to Drilled and Cased |
2010-12-11 | Liner Casing Operation Performed |
2010-12-11 | Rig Released |
2010-12-14 | Well Log Performed |
2010-12-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-12-30 | Perforation Treatment Performed - Open-Hole Completion |
2011-01-03 | Well Began Production |
2011-01-03 | Well Fluid changed to Gas |
2011-01-03 | Well Mode changed to Flowing |
2011-03-23 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-11-25 | 2483.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-12-30 | Open Hole/Barefoot Completion | 4170.00 | 4175.00 | 0 |
2010-12-30 | Multi-Stage Fracture | 3583.40 | 3648.80 | 0 |
2010-12-30 | Multi-Stage Fracture | 3506.10 | 3583.30 | 0 |
2010-12-30 | Multi-Stage Fracture | 3430.00 | 3506.00 | 0 |
2010-12-30 | Multi-Stage Fracture | 3354.30 | 3429.90 | 0 |
2010-12-30 | Multi-Stage Fracture | 3278.70 | 3354.20 | 0 |
2010-12-30 | Multi-Stage Fracture | 3213.90 | 3278.60 | 0 |
2010-12-30 | Multi-Stage Fracture | 3137.90 | 3213.80 | 0 |
2010-12-30 | Multi-Stage Fracture | 3061.90 | 3137.80 | 0 |
2010-12-30 | Multi-Stage Fracture | 2986.20 | 3061.80 | 0 |
2010-12-30 | Multi-Stage Fracture | 2910.80 | 2986.10 | 0 |
2010-12-30 | Multi-Stage Fracture | 4148.30 | 4170.00 | 0 |
2010-12-30 | Multi-Stage Fracture | 2835.60 | 2910.70 | 0 |
2010-12-30 | Multi-Stage Fracture | 2759.50 | 2835.50 | 0 |
2010-12-30 | Multi-Stage Fracture | 2683.80 | 2759.40 | 0 |
2010-12-30 | Multi-Stage Fracture | 2632.00 | 2683.70 | 0 |
2010-12-30 | Multi-Stage Fracture | 4103.90 | 4148.20 | 0 |
2010-12-30 | Multi-Stage Fracture | 4025.50 | 4103.80 | 0 |
2010-12-30 | Multi-Stage Fracture | 3946.90 | 4025.40 | 0 |
2010-12-30 | Multi-Stage Fracture | 3880.10 | 3946.80 | 0 |
2010-12-30 | Multi-Stage Fracture | 3802.60 | 3880.00 | 0 |
2010-12-30 | Multi-Stage Fracture | 3724.90 | 3802.50 | 0 |
2010-12-30 | Multi-Stage Fracture | 3648.90 | 3724.80 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 8136 | 0.0 | 0.0 | 0.0 |
2012 | 8375 | 0.0 | 0.0 | 0.0 |
2013 | 8207 | 0.0 | 0.0 | 0.0 |
2014 | 6623 | 0.0 | 0.0 | 0.0 |
2015 | 8591 | 0.0 | 0.0 | 0.0 |
2016 | 8375 | 0.0 | 0.0 | 0.0 |
2017 | 2903 | 0.0 | 0.0 | 0.0 |
2018 | 8231 | 0.0 | 0.0 | 0.0 |
2019 | 8687 | 0.0 | 0.0 | 0.0 |
2020 | 2112 | 0.0 | 0.0 | 0.0 |
For data sources see[6]