X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595192010002

Well Details

Well ID: 0595192010002
Loading map...
Location: 00/10-20-059-19W5/2
Location Alias: 00/10-20-59-19 W5M
Location Alias 2: 00/10-20-059-19 W5/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 19
Section: 20
County/Municipality: Municipal District of Greenview No. 16
Well Name: AMOCO PRESLEY 10-20-59-19
Operator Name: BP Canada Energy Group ULC
License Number: 0088147
License Date: 1981-01-08
License Status: RecCertified
Spud Date: 1981-01-20
Final Drill Date: 1981-02-17
Well Total Depth: 2310.00 m
Surface Hole Latitude: 54.118192
Surface Hole Longitude: -116.808227

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-01-08 Obtained License
1981-01-22 Lost Circulation Occurred
1981-02-17 Finished Drilling
1981-02-20 Drill Stem Test Performed
1981-02-21 Drill Stem Test Performed
1981-02-22 Drill Stem Test Performed
1981-02-24 Production Casing Operation Performed
1981-03-14 Perforation Treatment Performed - Jet Perforation
1981-03-17 Perforation Treatment Performed - Fractured
1982-01-30 Perforation Treatment Performed - Jet Perforation
1982-02-06 Well Mode changed to Drilled and Cased
1996-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-10 Perforation Treatment Performed - Cement Plug
1996-10-10 Perforation Treatment Performed - Jet Perforation
1996-10-10 Perforation Treatment Performed - Remedial Casing
1996-10-10 Plug Back Performed
1996-10-10 Well Log Performed
1996-10-10 Well Mode changed to Abandoned Zone
1996-10-12 Well Abandoned
1996-10-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-03-14 Perforation 2268.50 2272.00 13
1996-10-10 Remedial Casing Cementing 377.00 377.50 0
1996-10-10 Cement Plug 175.00 377.50 0
1981-03-17 Fracture 2268.50 2272.00 0
1982-01-30 Perforation 2027.50 2030.00 7
1982-01-30 Perforation 2031.50 2033.00 7
1982-01-30 Perforation 2034.50 2037.00 7
1982-01-30 Perforation 2035.50 2041.00 7
1996-10-10 Packing Device Capped w/Cement 2240.00 2248.00 0
1996-10-10 Packing Device Capped w/Cement 2007.00 2015.00 0
1996-10-10 Perforation 377.00 377.50 13

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-01-22 Lost Circulation 59.00 229.00

For data sources see[5]

References