X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595191913000

Well Details

Well ID: 0595191913000
Loading map...
Location: 00/13-19-059-19W5/0
Location Alias: 00/13-19-59-19 W5M
Location Alias 2: 00/13-19-059-19 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 19
Section: 19
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 13-19-59-19
Operator Name: Paramount Resources Ltd.
License Number: 0436070
License Date: 2011-08-16
License Status: Issued
Spud Date: 2011-09-14
Final Drill Date: 2011-10-08
Well Total Depth: 4057.00 m
Surface Hole Latitude: 54.120082
Surface Hole Longitude: -116.824666

For data sources see[1][2]

Well History

Date Event
2011-08-16 Obtained License
2011-09-15 Lost Circulation Occurred
2011-09-18 Surface Casing Operation Performed
2011-09-27 Well Log Performed
2011-09-28 Intermediate Casing Operation Performed
2011-09-29 Direction Drilling Operation Performed - Horizontal
2011-10-08 Finished Drilling
2011-10-08 Well Mode changed to Drilled and Cased
2011-10-12 Liner Casing Operation Performed
2011-10-14 Rig Released
2011-10-19 Well Log Performed
2011-10-22 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-22 Perforation Treatment Performed - Open-Hole Completion
2011-10-28 Well Began Production
2011-10-28 Well Fluid changed to Gas
2011-10-28 Well Mode changed to Flowing
2012-02-26 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-29 2570.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-22 Open Hole/Barefoot Completion 4053.00 4057.00 0
2011-10-22 Multi-Stage Fracture 3475.10 3475.20 0
2011-10-22 Multi-Stage Fracture 3399.90 3400.00 0
2011-10-22 Multi-Stage Fracture 3336.30 3336.40 0
2011-10-22 Multi-Stage Fracture 3261.50 3261.60 0
2011-10-22 Multi-Stage Fracture 3186.00 3186.10 0
2011-10-22 Multi-Stage Fracture 3122.50 3122.60 0
2011-10-22 Multi-Stage Fracture 3047.20 3047.30 0
2011-10-22 Multi-Stage Fracture 2972.10 2972.20 0
2011-10-22 Multi-Stage Fracture 2895.90 2896.00 0
2011-10-22 Multi-Stage Fracture 2830.60 2830.70 0
2011-10-22 Multi-Stage Fracture 4032.20 4032.30 0
2011-10-22 Multi-Stage Fracture 2754.30 2754.40 0
2011-10-22 Multi-Stage Fracture 2687.30 2687.40 0
2011-10-22 Multi-Stage Fracture 2608.80 2608.90 0
2011-10-22 Multi-Stage Fracture 2541.90 2542.00 0
2011-10-22 Multi-Stage Fracture 3978.10 3978.20 0
2011-10-22 Multi-Stage Fracture 3903.30 3903.40 0
2011-10-22 Multi-Stage Fracture 3840.30 3840.40 0
2011-10-22 Multi-Stage Fracture 3759.60 3759.70 0
2011-10-22 Multi-Stage Fracture 3689.50 3689.60 0
2011-10-22 Multi-Stage Fracture 3625.70 3625.80 0
2011-10-22 Multi-Stage Fracture 3550.50 3550.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1560 0.0 0.0 0.0
2012 8472 0.0 0.0 0.0
2013 8688 0.0 0.0 0.0
2014 8375 0.0 0.0 0.0
2015 8495 0.0 0.0 0.0
2016 8711 0.0 0.0 0.0
2017 8423 0.0 0.0 0.0
2018 7847 0.0 0.0 0.0
2019 7679 0.0 0.0 0.0
2020 2160 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-09-15 Lost Circulation 20.00 143.00
2012-03-02 No Incident Encountered 0.00 0.00

For data sources see[7]

References