X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595191901000

Well Details

Well ID: 0595191901000
Loading map...
Location: 00/01-19-059-19W5/0
Location Alias: 00/01-19-59-19 W5M
Location Alias 2: 00/01-19-059-19 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 19
Section: 19
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 1-19-59-19
Operator Name: Paramount Resources Ltd.
License Number: 0424699
License Date: 2010-10-18
License Status: Issued
Spud Date: 2010-12-15
Final Drill Date: 2011-01-24
Well Total Depth: 4279.00 m
Surface Hole Latitude: 54.110915
Surface Hole Longitude: -116.854986

For data sources see[1][2]

Well History

Date Event
2010-10-18 Obtained License
2010-12-15 Lost Circulation Occurred
2010-12-22 Surface Casing Operation Performed
2011-01-15 Direction Drilling Operation Performed - Horizontal
2011-01-16 Intermediate Casing Operation Performed
2011-01-24 Finished Drilling
2011-01-24 Well Log Performed
2011-01-24 Well Mode changed to Drilled and Cased
2011-01-30 Liner Casing Operation Performed
2011-01-31 Rig Released
2011-02-14 Well Log Performed
2011-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-17 Perforation Treatment Performed - Open-Hole Completion
2011-02-20 Well Began Production
2011-02-20 Well Fluid changed to Gas
2011-02-20 Well Mode changed to Flowing
2011-11-23 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-15 2649.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-17 Open Hole/Barefoot Completion 4275.00 4279.00 0
2011-02-17 Multi-Stage Fracture 3686.40 3761.80 0
2011-02-17 Multi-Stage Fracture 3611.40 3686.30 0
2011-02-17 Multi-Stage Fracture 3536.60 3611.30 0
2011-02-17 Multi-Stage Fracture 3462.20 3536.50 0
2011-02-17 Multi-Stage Fracture 3386.50 3462.10 0
2011-02-17 Multi-Stage Fracture 3312.00 3386.40 0
2011-02-17 Multi-Stage Fracture 3237.30 3311.90 0
2011-02-17 Multi-Stage Fracture 3162.40 3237.20 0
2011-02-17 Multi-Stage Fracture 3086.90 3162.30 0
2011-02-17 Multi-Stage Fracture 3023.40 3086.80 0
2011-02-17 Multi-Stage Fracture 4254.20 4275.00 0
2011-02-17 Multi-Stage Fracture 2948.20 3023.30 0
2011-02-17 Multi-Stage Fracture 2872.90 2948.10 0
2011-02-17 Multi-Stage Fracture 2798.30 2872.80 0
2011-02-17 Multi-Stage Fracture 2723.40 2798.20 0
2011-02-17 Multi-Stage Fracture 4188.20 4254.10 0
2011-02-17 Multi-Stage Fracture 4125.00 4188.10 0
2011-02-17 Multi-Stage Fracture 4049.70 4124.90 0
2011-02-17 Multi-Stage Fracture 3974.40 4049.60 0
2011-02-17 Multi-Stage Fracture 3911.20 3974.30 0
2011-02-17 Multi-Stage Fracture 3836.30 3911.10 0
2011-02-17 Multi-Stage Fracture 3761.90 3836.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7103 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 7799 0.0 0.0 0.0
2015 8327 0.0 0.0 0.0
2016 4607 0.0 0.0 0.0
2017 7823 0.0 0.0 0.0
2018 6215 0.0 0.0 0.0
2019 8712 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-12-15 Lost Circulation 157.00 202.00

For data sources see[7]

References