X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595191701000

Well Details

Well ID: 0595191701000
Loading map...
Location: 00/01-17-059-19W5/0
Location Alias: 00/01-17-59-19 W5M
Location Alias 2: 00/01-17-059-19 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 19
Section: 17
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 1-17-59-19
Operator Name: Paramount Resources Ltd.
License Number: 0399827
License Date: 2008-08-19
License Status: Issued
Spud Date: 2008-12-05
Final Drill Date: 2008-12-16
Well Total Depth: 3490.00 m
Surface Hole Latitude: 54.107886
Surface Hole Longitude: -116.806205

For data sources see[1][2]

Well History

Date Event
2008-08-19 Obtained License
2008-11-21 Surface Casing Operation Performed
2008-11-24 Direction Drilling Operation Performed - Deviate
2008-12-02 Well Mode changed to Drilled and Cased
2008-12-03 Intermediate Casing Operation Performed
2008-12-06 Lost Circulation Occurred
2008-12-12 Direction Drilling Operation Performed - Horizontal
2008-12-16 Finished Drilling
2008-12-16 Liner Casing Operation Performed
2008-12-16 Well Log Performed
2008-12-18 Rig Released
2008-12-28 Well Log Performed
2008-12-29 Perforation Treatment Performed - Multi-Stage Fracture
2008-12-29 Perforation Treatment Performed - Open-Hole Completion
2008-12-30 Well Began Production
2008-12-30 Well Fluid changed to Gas
2008-12-30 Well Mode changed to Flowing
2013-04-20 Well Fluid changed to Gas
2013-04-20 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-11-24 2044.80 Deviate (5 - 79 degrees)
2008-12-12 2544.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-12-29 Open Hole/Barefoot Completion 3443.10 3490.00 0
2008-12-29 Multi-Stage Fracture 3435.00 3435.10 0
2008-12-29 Multi-Stage Fracture 3329.80 3329.90 0
2008-12-29 Multi-Stage Fracture 3023.60 3023.70 0
2008-12-29 Multi-Stage Fracture 2912.80 2912.90 0
2008-12-29 Multi-Stage Fracture 2792.80 2792.90 0
2008-12-29 Multi-Stage Fracture 2682.00 2682.10 0
2008-12-29 Multi-Stage Fracture 2609.20 2609.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 43 0.0 0.0 0.0
2009 6839 0.0 0.0 0.0
2010 6719 0.0 0.0 0.0
2011 4679 0.0 0.0 0.0
2012 5471 0.0 0.0 0.0
2013 6216 0.0 0.0 0.0
2014 7727 0.0 0.0 0.0
2015 8615 0.0 0.0 0.0
2016 7199 0.0 0.0 0.0
2017 3792 0.0 0.0 0.0
2018 8135 0.0 0.0 0.0
2019 8711 0.0 0.0 0.0
2020 1896 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-12-06 Lost Circulation 84.00 191.00
2009-01-13 No Incident Encountered 0.00 0.00

For data sources see[7]

References