X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595190810022

Well Details

Well ID: 0595190810022
Loading map...
Location: 02/10-08-059-19W5/2
Location Alias: 02/10-08-59-19 W5M
Location Alias 2: 02/10-08-059-19 W5/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 19
Section: 08
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY 102 KAYBOBS 10-8-59-19
Operator Name: Paramount Resources Ltd.
License Number: 0242620
License Date: 2000-09-29
License Status: Suspension
Spud Date: 2000-10-22
Final Drill Date: 2000-11-02
Well Total Depth: 2413.00 m
Surface Hole Latitude: 54.088269
Surface Hole Longitude: -116.809896

For data sources see[1][2]

Well History

Date Event
2000-09-29 Obtained License
2000-10-23 Lost Circulation Occurred
2000-10-24 Surface Casing Operation Performed
2000-11-02 Finished Drilling
2000-11-02 Well Log Performed
2000-11-02 Well Mode changed to Drilled and Cased
2000-11-03 Well Log Performed
2000-11-06 Production Casing Operation Performed
2000-11-06 Rig Released
2000-11-21 Perforation Treatment Performed - Jet Perforation
2000-11-21 Well Log Performed
2000-11-23 Perforation Treatment Performed - Fractured
2002-04-05 Perforation Treatment Performed - Jet Perforation
2002-04-05 Well Log Performed
2002-04-08 Perforation Treatment Performed - Fractured
2004-06-25 Perforation Treatment Performed - Cement Squeeze
2004-07-01 Perforation Treatment Performed - Cement Squeeze
2004-07-05 Well Log Performed
2004-07-06 Perforation Treatment Performed - Jet Perforation
2004-07-06 Well Log Performed
2004-07-08 Perforation Treatment Performed - Fractured
2005-12-15 Well Log Performed
2005-12-16 Perforation Treatment Performed - Jet Perforation
2005-12-16 Well Log Performed
2005-12-17 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-11-21 Perforation 2250.50 2254.50 17
2005-12-17 Fracture 1566.00 1570.00 0
2000-11-23 Fracture 2250.50 2254.50 0
2002-04-05 Perforation 1971.00 1973.00 17
2002-04-08 Fracture 1971.00 1973.00 0
2004-06-25 Cement Squeeze 1971.00 1973.00 0
2004-07-01 Cement Squeeze 2250.50 2254.50 0
2004-07-06 Perforation 2366.00 2373.00 17
2004-07-08 Fracture 2366.00 2373.00 0
2005-12-16 Perforation 1566.00 1570.00 17

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2000-10-23 Lost Circulation 173.00 173.00

For data sources see[5]

References