X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595190716000

Well Details

Well ID: 0595190716000
Loading map...
Location: 00/16-07-059-19W5/0
Location Alias: 00/16-07-59-19 W5M
Location Alias 2: 00/16-07-059-19 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 19
Section: 07
County/Municipality: Municipal District of Greenview No. 16
Well Name: CNRL KAYBOBS 16-7-59-19
Operator Name: Canadian Natural Resources Limited
License Number: 0424421
License Date: 2010-10-08
License Status: Issued
Spud Date: 2010-11-07
Final Drill Date: 2010-11-26
Well Total Depth: 3870.00 m
Surface Hole Latitude: 54.091951
Surface Hole Longitude: -116.850911

For data sources see[1][2]

Well History

Date Event
2010-10-08 Obtained License
2010-11-09 Surface Casing Operation Performed
2010-11-12 Direction Drilling Operation Performed - Deviate
2010-11-17 Direction Drilling Operation Performed - Horizontal
2010-11-17 Well Log Performed
2010-11-18 Intermediate Casing Operation Performed
2010-11-18 Well Log Performed
2010-11-26 Finished Drilling
2010-11-26 Well Log Performed
2010-11-26 Well Mode changed to Drilled and Cased
2010-11-27 Well Log Performed
2010-11-30 Perforation Treatment Performed - Open-Hole Completion
2010-11-30 Production Casing Operation Performed
2010-12-01 Rig Released
2010-12-04 Well Log Performed
2010-12-14 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-16 Well Fluid changed to Gas
2010-12-16 Well Mode changed to Testing
2011-02-01 Well Began Production
2011-02-01 Well Fluid changed to Gas
2011-02-01 Well Mode changed to Flowing
2017-02-01 Well Fluid changed to Gas
2017-02-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-12 1635.00 Deviate (5 - 79 degrees)
2010-11-17 2633.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-30 Open Hole/Barefoot Completion 3860.00 3870.00 0
2010-12-14 Multi-Stage Fracture 3390.00 3390.10 0
2010-12-14 Multi-Stage Fracture 3466.60 3466.70 0
2010-12-14 Multi-Stage Fracture 3558.00 3558.10 0
2010-12-14 Multi-Stage Fracture 3633.00 3633.10 0
2010-12-14 Multi-Stage Fracture 3707.40 3707.50 0
2010-12-14 Multi-Stage Fracture 2740.00 2740.10 0
2010-12-14 Multi-Stage Fracture 2814.50 2814.60 0
2010-12-14 Multi-Stage Fracture 2902.60 2902.70 0
2010-12-14 Multi-Stage Fracture 2978.30 2978.40 0
2010-12-14 Multi-Stage Fracture 3065.00 3065.10 0
2010-12-14 Multi-Stage Fracture 3138.60 3138.70 0
2010-12-14 Multi-Stage Fracture 3227.70 3227.80 0
2010-12-14 Multi-Stage Fracture 3300.00 3300.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 114 0.0 0.0 0.0
2011 5294 0.0 0.0 0.0
2012 2009 0.0 0.0 0.0
2013 7344 0.0 0.0 0.0
2014 8756 0.0 0.0 0.0
2015 8137 0.0 0.0 0.0
2016 7550 0.0 0.0 0.0
2017 6737 0.0 0.0 0.0
2018 6803 0.0 0.0 0.0
2019 6962 0.0 0.0 0.0
2020 796 0.0 0.0 0.0

For data sources see[6]

References