X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595190503000

Well Details

Well ID: 0595190503000
Loading map...
Location: 00/03-05-059-19W5/0
Location Alias: 00/03-05-59-19 W5M
Location Alias 2: 00/03-05-059-19 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 19
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: SPRY2 HZ KAYBOBS 3-5-59-19
Operator Name: TORC Oil & Gas Ltd.
License Number: 0479753
License Date: 2016-06-24
License Status: Amended
Spud Date: 2016-09-14
Final Drill Date: 2016-09-25
Well Total Depth: 3199.00 m
Surface Hole Latitude: 54.081083
Surface Hole Longitude: -116.813712

For data sources see[1][2]

Well History

Date Event
2016-06-24 Obtained License
2016-09-15 Lost Circulation Occurred
2016-09-18 Direction Drilling Operation Performed - Deviate
2016-09-20 Direction Drilling Operation Performed - Horizontal
2016-09-20 Well Log Performed
2016-09-24 Well Log Performed
2016-09-25 Finished Drilling
2016-09-25 Well Mode changed to Drilled and Cased
2016-09-26 Production Casing Operation Performed
2016-09-26 Rig Released
2016-09-30 Well Log Performed
2016-10-18 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-19 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-20 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-15 Well Began Production
2016-11-15 Well Fluid changed to Crude Oil
2016-11-15 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-09-14 Excalibur Drilling Ltd. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-09-18 1323.80 Deviate (5 - 79 degrees)
2016-09-20 1714.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-10-18 Multi-Stage Fracture 3166.60 3166.90 0
2016-10-19 Multi-Stage Fracture 2735.50 2737.40 0
2016-10-19 Multi-Stage Fracture 2690.50 2692.40 0
2016-10-19 Multi-Stage Fracture 2645.20 2647.10 0
2016-10-19 Multi-Stage Fracture 2600.10 2601.90 0
2016-10-19 Multi-Stage Fracture 2554.80 2556.70 0
2016-10-19 Multi-Stage Fracture 2509.80 2511.70 0
2016-10-19 Multi-Stage Fracture 2452.00 2453.90 0
2016-10-19 Multi-Stage Fracture 2406.90 2408.70 0
2016-10-19 Multi-Stage Fracture 2364.10 2366.00 0
2016-10-19 Multi-Stage Fracture 2307.70 2309.60 0
2016-10-18 Multi-Stage Fracture 3123.60 3125.50 0
2016-10-19 Multi-Stage Fracture 2262.30 2264.20 0
2016-10-19 Multi-Stage Fracture 2217.20 2219.10 0
2016-10-20 Multi-Stage Fracture 2171.80 2173.70 0
2016-10-20 Multi-Stage Fracture 2126.40 2128.30 0
2016-10-20 Multi-Stage Fracture 2067.50 2069.40 0
2016-10-20 Multi-Stage Fracture 2022.10 2024.00 0
2016-10-20 Multi-Stage Fracture 1963.20 1965.00 0
2016-10-20 Multi-Stage Fracture 1917.80 1919.70 0
2016-10-20 Multi-Stage Fracture 1872.60 1874.50 0
2016-10-20 Multi-Stage Fracture 1813.70 1815.60 0
2016-10-18 Multi-Stage Fracture 3078.20 3080.10 0
2016-10-18 Multi-Stage Fracture 3019.60 3021.50 0
2016-10-19 Multi-Stage Fracture 2974.60 2976.50 0
2016-10-19 Multi-Stage Fracture 2929.80 2931.70 0
2016-10-19 Multi-Stage Fracture 2884.60 2886.50 0
2016-10-19 Multi-Stage Fracture 2839.30 2841.20 0
2016-10-19 Multi-Stage Fracture 2793.90 2795.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-10-19 2016-10-20 1,589 0 N/A
2 2016-10-18 2016-10-20 1,589 3,664 N/A
3 2016-10-18 2016-10-18 1,589 0 N/A
4 2016-10-19 2016-10-19 1,589 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 2.12 N/A
AI-11 Trican Corrosion Inhibitor non-hazardous ingredients Not Available 100 0.0078 N/A
potassium iodide 7681-11-0 100 0.0078 N/A
propargyl alcohol 107-19-7 100 0.0078 N/A
propargyl alcohol derivative 9393 100 0.0078 N/A
IC-11 Trican Iron Control 2-mercaptoethanol 60-24-2 100 0.0065 N/A
ammonia 7664-41-7 100 0.0065 N/A
cupric chloride dihydrate 10125-13-0 100 0.0065 N/A
potassium iodide 7681-11-0 100 0.0065 N/A
ASA-61 Trican Surfactant alkylbenzenesulfonic acid 68584-22-5 100 0.0266 N/A
benzenesulfonic acid. decyl(sulfophenoxy)-. disodium salt 36445-71-3 100 0.0266 N/A
dipropylene glycol 25265-71-8 100 0.0266 N/A
non-hazardous ingredients Not Available 100 0.0266 N/A
S-4W Trican Surfactant diethanolamine 111-42-2 100 0.0193 N/A
fatty acid alkanolamide 68603-42-9 100 0.0193 N/A
fatty acids. coco. compds. with diethanolamine 61790-63-4 100 0.0193 N/A
methanol 67-56-1 100 0.0193 N/A
phosphoric acid. mixed decyl and
octyl esters. compds. with diethanolamine
68425-57-0 100 0.0193 N/A
2 water Not Available 100 61.7339 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 14.2927 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0105 N/A
2-mercaptoethanol 60-24-2 100 0.0105 N/A
dibromoacetonitrile 3252-43-5 100 0.0105 N/A
non-hazardous ingredients Not Available 100 0.0105 N/A
sodium bromide 7647-15-6 100 0.0105 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0908 N/A
water Not Available 100 0.0908 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.043 N/A
propylene glycol 57-55-6 100 0.043 N/A
GFR-5D Trican Friction Reducer anionic polyacrylamide Not Available 100 0.0371 N/A
3 Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 2.8465 N/A
4 GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0054 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-09-25 2016-10-20 Surface Water - Runoff 3694

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 1104 0.0 0.0 0.0
2017 4932 0.0 0.0 0.0
2018 8510 0.0 0.0 0.0
2019 8404 0.0 0.0 0.0
2020 808 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-15 Lost Circulation 50.00 114.00
2016-10-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References