X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595190404000

Well Details

Well ID: 0595190404000
Loading map...
Location: 00/04-04-059-19W5/0
Location Alias: 00/04-04-59-19 W5M
Location Alias 2: 00/04-04-059-19 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 19
Section: 04
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC ET AL HZ KAYBOBS 4-4-59-19
Operator Name: XTO Energy Canada ULC
License Number: 0423568
License Date: 2010-09-16
License Status: Suspension
Spud Date: 2010-10-04
Final Drill Date: 2010-10-23
Well Total Depth: 3633.00 m
Surface Hole Latitude: 54.079417
Surface Hole Longitude: -116.795347

For data sources see[1][2]

Well History

Date Event
2010-09-16 Obtained License
2010-10-05 Surface Casing Operation Performed
2010-10-08 Direction Drilling Operation Performed - Horizontal
2010-10-16 Well Log Performed
2010-10-17 Production Casing Operation Performed
2010-10-23 Finished Drilling
2010-10-23 Well Log Performed
2010-10-23 Well Mode changed to Drilled and Cased
2010-10-24 Liner Casing Operation Performed
2010-10-24 Perforation Treatment Performed - Open-Hole Completion
2010-10-25 Rig Released
2010-10-30 Well Log Performed
2010-11-01 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-01 Well Began Production
2010-11-01 Well Fluid changed to Gas
2010-11-01 Well Mode changed to Flowing
2011-03-09 Well Fluid changed to Gas
2011-03-09 Well Mode changed to Pumping
2014-08-01 Well Fluid changed to Gas
2014-08-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-08 1548.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-24 Open Hole/Barefoot Completion 3612.20 3633.00 0
2010-11-01 Multi-Stage Fracture 2830.50 2832.10 0
2010-11-01 Multi-Stage Fracture 2733.60 2735.20 0
2010-11-01 Multi-Stage Fracture 2637.30 2638.90 0
2010-11-01 Multi-Stage Fracture 2525.10 2526.70 0
2010-11-01 Multi-Stage Fracture 2462.30 2463.90 0
2010-11-01 Multi-Stage Fracture 3607.70 3608.60 0
2010-11-01 Multi-Stage Fracture 3548.60 3550.20 0
2010-11-01 Multi-Stage Fracture 3448.50 3450.10 0
2010-11-01 Multi-Stage Fracture 3345.50 3347.10 0
2010-11-01 Multi-Stage Fracture 3243.20 3244.80 0
2010-11-01 Multi-Stage Fracture 2143.30 2144.90 0
2010-11-01 Multi-Stage Fracture 3044.10 3045.70 0
2010-11-01 Multi-Stage Fracture 2930.50 2932.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1280 0.0 0.0 0.0
2011 6568 0.0 0.0 0.0
2012 94 0.0 0.0 0.0
2013 609 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-11-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References