X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595190316030

Well Details

Well ID: 0595190316030
Loading map...
Location: 03/16-03-059-19W5/0
Location Alias: 03/16-03-59-19 W5M
Location Alias 2: 03/16-03-059-19 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 19
Section: 03
County/Municipality: Municipal District of Greenview No. 16
Well Name: SPRY2 KAYBOBS 16-3-59-19
Operator Name: TORC Oil & Gas Ltd.
License Number: 0471178
License Date: 2014-11-06
License Status: Issued
Spud Date: 2014-11-22
Final Drill Date: 2014-12-02
Well Total Depth: 3058.00 m
Surface Hole Latitude: 54.078438
Surface Hole Longitude: -116.779094

For data sources see[1][2]

Well History

Date Event
2014-11-06 Obtained License
2014-11-23 Surface Casing Operation Performed
2014-11-24 Direction Drilling Operation Performed - Deviate
2014-11-25 Direction Drilling Operation Performed - Horizontal
2014-11-26 Intermediate Casing Operation Performed
2014-11-26 Well Log Performed
2014-12-02 Finished Drilling
2014-12-02 Well Log Performed
2014-12-02 Well Mode changed to Drilled and Cased
2014-12-03 Liner Casing Operation Performed
2014-12-04 Rig Released
2014-12-18 Well Log Performed
2015-01-05 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-05 Perforation Treatment Performed - Open-Hole Completion
2015-01-08 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-09 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-21 Well Began Production
2015-01-21 Well Fluid changed to Crude Oil
2015-01-21 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-11-22 Excalibur Drilling Ltd. 4 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-11-24 1192.80 Deviate (5 - 79 degrees)
2014-11-25 1612.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-01-05 Open Hole/Barefoot Completion 1688.00 3058.00 0
2015-01-05 Multi-Stage Fracture 2669.30 2669.40 0
2015-01-08 Multi-Stage Fracture 2625.40 2625.70 0
2015-01-08 Multi-Stage Fracture 2581.10 2581.20 0
2015-01-08 Multi-Stage Fracture 2491.90 2492.10 0
2015-01-08 Multi-Stage Fracture 2447.20 2447.40 0
2015-01-08 Multi-Stage Fracture 2402.40 2402.60 0
2015-01-08 Multi-Stage Fracture 2360.20 2360.40 0
2015-01-08 Multi-Stage Fracture 2316.60 2316.80 0
2015-01-08 Multi-Stage Fracture 2272.20 2272.40 0
2015-01-09 Multi-Stage Fracture 2231.60 2231.80 0
2015-01-05 Multi-Stage Fracture 3023.00 3023.30 0
2015-01-09 Multi-Stage Fracture 2188.60 2188.80 0
2015-01-09 Multi-Stage Fracture 2143.70 2143.90 0
2015-01-09 Multi-Stage Fracture 2010.30 2010.50 0
2015-01-09 Multi-Stage Fracture 1965.20 1965.40 0
2015-01-09 Multi-Stage Fracture 1920.40 1920.60 0
2015-01-09 Multi-Stage Fracture 1875.20 1875.40 0
2015-01-09 Multi-Stage Fracture 1829.80 1830.00 0
2015-01-09 Multi-Stage Fracture 1785.60 1785.80 0
2015-01-09 Multi-Stage Fracture 1741.70 1741.90 0
2015-01-05 Multi-Stage Fracture 2978.40 2978.60 0
2015-01-05 Multi-Stage Fracture 2935.90 2936.10 0
2015-01-05 Multi-Stage Fracture 2891.10 2891.30 0
2015-01-05 Multi-Stage Fracture 2847.90 2848.10 0
2015-01-05 Multi-Stage Fracture 2801.80 2802.00 0
2015-01-05 Multi-Stage Fracture 2757.30 2757.50 0
2015-01-05 Multi-Stage Fracture 2713.90 2714.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-05 2015-01-09 1,497 3,640 N/A
2 2015-01-05 2015-01-08 1,497 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 4.1111 N/A
water Not Available 100 85.322 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 9.5342 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0089 N/A
dibromoacetonitrile 3252-43-5 100 0.0089 N/A
non-hazardous ingredients Not Available 100 0.0089 N/A
polyethylene glycol 25322-68-3 100 0.0089 N/A
sodium bromide 7647-15-6 100 0.0089 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0023 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.135 N/A
water Not Available 100 0.135 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0722 N/A
propylene glycol 57-55-6 100 0.0722 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.068 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.068 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.068 N/A
2 Sand 30/50 Trican silica crystalline 14808-60-7 100 6.4454 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-12-29 2015-01-01 Surface Water - River 3960
2014-12-29 2015-01-09 Municipal Water 327

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 7530 0.0 0.0 0.0
2016 6156 0.0 0.0 0.0
2017 6679 0.0 0.0 0.0
2018 6700 0.0 0.0 0.0
2019 7901 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-04 No Incident Encountered 0.00 0.00
2015-01-21 No Incident Encountered 0.00 0.00

For data sources see[10]

References