X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595181013000

Well Details

Well ID: 0595181013000
Loading map...
Location: 00/13-10-059-18W5/0
Location Alias: 00/13-10-59-18 W5M
Location Alias 2: 00/13-10-059-18 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 18
Section: 10
County/Municipality: Woodlands County
Well Name: ACL KAYBOBS 13-10-59-18
Operator Name: Paramount Resources Ltd.
License Number: 0173872
License Date: 1994-12-12
License Status: Suspension
Spud Date: 1995-01-06
Final Drill Date: 1995-01-17
Well Total Depth: 2395.00 m
Surface Hole Latitude: 54.090505
Surface Hole Longitude: -116.620963

For data sources see[1][2]

Well History

Date Event
1994-12-12 Obtained License
1995-01-06 Lost Circulation Occurred
1995-01-08 Surface Casing Operation Performed
1995-01-17 Finished Drilling
1995-01-17 Well Log Performed
1995-01-17 Well Mode changed to Drilled and Cased
1995-01-18 Well Log Performed
1995-01-19 Production Casing Operation Performed
1995-01-20 Rig Released
1995-01-25 Perforation Treatment Performed - Jet Perforation
1995-01-25 Well Log Performed
1995-01-27 Perforation Treatment Performed - Fractured
1995-01-31 Perforation Treatment Performed - Jet Perforation
1995-01-31 Well Log Performed
1995-06-12 Well Began Production
1995-06-12 Well Fluid changed to Gas
1995-06-12 Well Mode changed to Flowing
2008-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-26 Plug Back Performed
2008-07-26 Well Fluid changed to Gas
2008-07-26 Well Mode changed to Abandoned Zone
2008-07-30 Perforation Treatment Performed - Jet Perforation
2008-08-04 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-01-25 Perforation 2293.00 2302.00 13
1995-01-27 Fracture 2293.00 2302.00 0
1995-01-31 Perforation 2028.00 2037.00 13
2008-07-26 Packing Device Capped w/Cement 2282.50 2285.50 0
2008-07-30 Perforation 2267.00 2269.00 17
2008-08-04 Fracture 2267.00 2269.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 4577 0.0 0.0 0.0
1996 8474 0.0 0.0 0.0
1997 6804 0.0 0.0 0.0
1998 3885 0.0 0.0 0.0
1999 7649 0.0 0.0 0.0
2000 8068 0.0 0.0 0.0
2001 7639 0.0 0.0 0.0
2002 8332 0.0 0.0 0.0
2003 8027 0.0 0.0 0.0
2004 8389 0.0 0.0 0.0
2005 8094 0.0 0.0 0.0
2006 8397 0.0 0.0 0.0
2007 7563 0.0 0.0 0.0
2008 3503 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1995-01-06 Lost Circulation 67.00 385.00

For data sources see[6]

References