X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595180201000

Well Details

Well ID: 0595180201000
Loading map...
Location: 00/01-02-059-18W5/0
Location Alias: 00/01-02-59-18 W5M
Location Alias 2: 00/01-02-059-18 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 18
Section: 02
County/Municipality: Woodlands County
Well Name: TRILOGY BLGU 3 KAYBOBS 1-2-59-18
Operator Name: Paramount Resources Ltd.
License Number: 0037690
License Date: 1970-01-28
License Status: Suspension
Spud Date: 1970-02-06
Final Drill Date: 1970-03-22
Well Total Depth: 3385.10 m
Surface Hole Latitude: 54.066958
Surface Hole Longitude: -116.578730

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-01-28 Obtained License
1970-03-22 Finished Drilling
1970-03-25 Production Casing Operation Performed
1970-07-03 Perforation Treatment Performed - Jet Perforation
1970-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-05-12 Well Mode changed to Drilled and Cased
1972-03-18 Well Began Production
1972-03-18 Well Fluid changed to Gas
1972-03-18 Well Mode changed to Flowing
1975-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-01-16 Well Began Injection
1984-01-16 Well Fluid changed to Gas
1984-01-16 Well Type changed to Injection
1984-06-05 Perforation Treatment Performed - Jet Perforation
1984-06-14 Perforation Treatment Performed - Jet Perforation
1984-06-15 Perforation Treatment Performed - Jet Perforation
1984-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-06 Well Fluid changed to Gas
1990-03-06 Well Mode changed to Flowing
1991-02-06 Well Log Performed
1991-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-02-07 Well Log Performed
1991-04-24 Well Log Performed
1992-01-14 Perforation Treatment Performed - Jet Perforation
1992-01-14 Well Log Performed
1992-01-18 Perforation Treatment Performed - Cement Squeeze
1994-01-01 Well Fluid changed to Gas
1994-01-01 Well Type changed to Storage
1995-10-07 Perforation Treatment Performed - Bridge Plug No Cement Required
1995-10-07 Plug Back Performed
1995-10-07 Well Fluid changed to Gas
1995-10-07 Well Mode changed to Abandoned and Whipstocked
1995-10-07 Well Type changed to Storage

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-07-03 Perforation 3269.60 3293.70 7
1991-02-07 Packing Device Capped w/Cement 3320.70 3324.00 0
1992-01-14 Perforation 3300.00 3302.00 13
1992-01-18 Cement Squeeze 3300.00 3302.00 0
1995-10-07 Bridge Plug, No Cement 3215.00 3215.00 0
1970-07-07 Acid Treatment 3269.60 3293.70 0
1970-07-08 Acid Treatment 3269.60 3293.70 0
1975-03-11 Packing Device Capped w/Cement 3273.60 3276.60 0
1984-06-05 Perforation 3269.60 3293.70 7
1984-06-14 Perforation 3352.50 3364.00 13
1984-06-15 Perforation 3330.10 3342.70 13
1984-06-15 Perforation 3342.80 3352.40 13
1984-06-29 Acid Treatment 3269.60 3364.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 84 0.0 0.0 0.0
1972 6266 0.0 0.0 0.0
1973 7653 0.0 0.0 0.0
1974 8440 0.0 0.0 0.0
1975 7121 0.0 0.0 0.0
1976 5642 0.0 0.0 0.0
1977 8024 0.0 0.0 0.0
1978 8404 0.0 0.0 0.0
1979 7129 0.0 0.0 0.0
1980 8080 0.0 0.0 0.0
1981 4773 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 4217 0.0 0.0 0.0
1991 2204 0.0 0.0 0.0
1992 7148 0.0 0.0 0.0
1993 7883 0.0 0.0 0.0
1994 6606 0.0 0.0 0.0
1995 1185 0.0 0.0 0.0

For data sources see[5]

References