X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595103110002

Well Details

Well ID: 0595103110002
Loading map...
Location: 00/10-31-059-10W5/2
Location Alias: 00/10-31-59-10 W5M
Location Alias 2: 00/10-31-059-10 W5/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 10
Section: 31
County/Municipality: Woodlands County
Well Name: DAYLIGHT WHCOURT 10-31-59-10
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0371724
License Date: 2007-01-12
License Status: Suspension
Spud Date: 2007-02-12
Final Drill Date: 2007-02-26
Well Total Depth: 1636.00 m
Surface Hole Latitude: 54.147968
Surface Hole Longitude: -115.486728

For data sources see[1][2]

Well History

Date Event
2007-01-12 Obtained License
2007-02-23 Direction Drilling Operation Performed - Deviate
2007-02-26 Finished Drilling
2007-02-26 Well Mode changed to Drilled and Cased
2007-02-27 Well Log Performed
2007-02-28 Production Casing Operation Performed
2007-02-28 Rig Released
2007-03-08 Perforation Treatment Performed - Jet Perforation
2007-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-10 Perforation Treatment Performed - Jet Perforation
2007-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-11 Perforation Treatment Performed - Jet Perforation
2007-03-11 Well Log Performed
2007-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-12 Perforation Treatment Performed - Jet Perforation
2007-03-12 Well Log Performed
2007-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-15 Perforation Treatment Performed - Jet Perforation
2007-03-15 Well Log Performed
2007-03-17 Perforation Treatment Performed - Jet Perforation
2007-03-17 Well Log Performed
2007-08-28 Well Began Production
2007-08-28 Well Fluid changed to Gas
2007-08-28 Well Mode changed to Flowing
2010-01-01 Well Fluid changed to Gas
2010-01-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-02-23 446.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-03-08 Perforation 1582.50 1583.00 17
2007-03-15 Perforation 358.00 360.00 17
2007-03-15 Perforation 353.00 355.00 17
2007-03-17 Perforation 342.00 344.00 17
2007-03-09 Packing Device Capped w/Cement 1567.00 1575.00 0
2007-03-10 Perforation 602.00 603.00 17
2007-03-10 Perforation 599.00 600.00 17
2007-03-11 Packing Device Capped w/Cement 582.00 590.00 0
2007-03-11 Perforation 414.00 417.00 17
2007-03-12 Packing Device Capped w/Cement 397.00 405.00 0
2007-03-12 Perforation 378.00 381.00 17
2007-03-15 Packing Device Capped w/Cement 365.00 373.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 219 0.0 0.0 0.0

For data sources see[6]

References