X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595063111000

Well Details

Well ID: 0595063111000
Loading map...
Location: 00/11-31-059-06W5/0
Location Alias: 00/11-31-59-06 W5M
Location Alias 2: 00/11-31-059-06 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 06
Section: 31
County/Municipality: County of Barrhead No. 11
Well Name: ANDERSON ET AL GNCOURTE 11-31-59-6
Operator Name: InPlay Oil Corp.
License Number: 0139129
License Date: 1989-03-07
License Status: Abandoned
Spud Date: 1989-03-10
Final Drill Date: 1989-03-17
Well Total Depth: 1300.00 m
Surface Hole Latitude: 54.145272
Surface Hole Longitude: -114.892492

For data sources see[1][2]

Well History

Date Event
1989-03-07 Obtained License
1989-03-11 Surface Casing Operation Performed
1989-03-17 Finished Drilling
1989-03-17 Well Log Performed
1989-03-18 Drill Stem Test Performed
1989-03-19 Drill Stem Test Performed
1989-03-20 Production Casing Operation Performed
1989-03-20 Rig Released
1989-05-29 Well Log Performed
1989-05-30 Well Log Performed
1989-05-31 Perforation Treatment Performed - Jet Perforation
1989-05-31 Well Log Performed
1989-06-01 Perforation Treatment Performed - Cement Squeeze
1989-06-01 Well Log Performed
1989-06-02 Perforation Treatment Performed - Jet Perforation
1989-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-03 Well Log Performed
1989-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-06-04 Plug Back Performed
1989-06-04 Well Log Performed
1989-06-05 Perforation Treatment Performed - Jet Perforation
1990-01-01 Well Mode changed to Drilled and Cased
1994-01-19 Well Began Production
1994-01-19 Well Fluid changed to Gas
1994-01-19 Well Mode changed to Flowing
1996-10-31 Well Fluid changed to Gas
1996-10-31 Well Mode changed to Suspended
1998-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-03-10 Perforation Treatment Performed - Jet Perforation
1998-03-10 Plug Back Performed
1998-03-10 Well Fluid changed to Gas
1998-03-10 Well Mode changed to Abandoned Zone
1998-03-12 Perforation Treatment Performed - Fractured
2019-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-09 Plug Back Performed
2019-03-09 Well Log Performed
2019-08-18 Well Log Performed
2019-08-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-05-31 Perforation 1259.00 1262.00 13
2019-03-09 Packing Device Capped w/Cement 1202.00 1210.00 0
1989-06-01 Cement Squeeze 1259.00 1262.00 0
1989-06-02 Perforation 1254.00 1256.00 13
1989-06-03 Acid Treatment 1254.00 1256.00 0
1989-06-04 Packing Device Capped w/Cement 1250.00 1253.00 0
1989-06-05 Perforation 1243.50 1245.50 13
1998-03-10 Packing Device Capped w/Cement 1230.00 1238.00 0
1998-03-10 Perforation 1220.00 1222.30 18
1998-03-12 Fracture 1220.00 1222.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 8053 0.0 0.0 0.0
1995 7823 0.0 0.0 0.0
1996 3912 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References