X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595063008002

Well Details

Well ID: 0595063008002
Loading map...
Location: 00/08-30-059-06W5/2
Location Alias: 00/08-30-59-06 W5M
Location Alias 2: 00/08-30-059-06 W5/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 06
Section: 30
County/Municipality: County of Barrhead No. 11
Well Name: ANDEX ET AL GNCOURTE 8-30-59-6
Operator Name: InPlay Oil Corp.
License Number: 0118780
License Date: 1985-10-31
License Status: Abandoned
Spud Date: 1985-10-31
Final Drill Date: 1985-11-04
Well Total Depth: 1330.00 m
Surface Hole Latitude: 54.127192
Surface Hole Longitude: -114.882285

For data sources see[1][2]

Well History

Date Event
1985-10-31 Obtained License
1985-11-01 Surface Casing Operation Performed
1985-11-04 Finished Drilling
1985-11-04 Well Mode changed to Drilled and Cased
1985-11-05 Drill Stem Test Performed
1985-11-05 Well Log Performed
1985-11-06 Production Casing Operation Performed
1985-11-06 Rig Released
1985-11-17 Well Log Performed
1985-11-18 Perforation Treatment Performed - Jet Perforation
1985-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-28 Well Log Performed
1988-08-30 Perforation Treatment Performed - Jet Perforation
1988-08-30 Well Log Performed
1988-08-31 Well Log Performed
1988-09-01 Perforation Treatment Performed - Cement Squeeze
1993-09-10 Well Log Performed
1993-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-11 Plug Back Performed
1993-09-11 Well Log Performed
1993-09-12 Perforation Treatment Performed - Jet Perforation
1993-09-13 Perforation Treatment Performed - Fractured
1993-10-01 Well Began Production
1993-10-01 Well Fluid changed to Gas
1993-10-01 Well Mode changed to Flowing
1996-06-18 Well Log Performed
1996-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-19 Plug Back Performed
1996-06-19 Well Fluid changed to Gas
1996-06-19 Well Mode changed to Abandoned Zone
1996-06-21 Well Log Performed
1996-06-22 Perforation Treatment Performed - Jet Perforation
1996-06-25 Perforation Treatment Performed - Fractured
1996-06-27 Well Log Performed
1996-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-28 Plug Back Performed
2004-09-22 Well Abandoned
2004-09-22 Well Fluid changed to Gas
2004-09-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-11-18 Perforation 1246.00 1251.00 13
1996-06-22 Perforation 1041.50 1044.50 13
1996-06-25 Fracture 1037.20 1044.50 0
1996-06-28 Packing Device Capped w/Cement 1017.00 1025.00 0
1985-11-19 Acid Treatment 1246.00 1251.00 0
1988-08-30 Perforation 1270.00 1274.00 13
1988-09-01 Cement Squeeze 1270.00 1274.00 0
1993-09-11 Packing Device Capped w/Cement 1232.00 1238.00 0
1993-09-12 Perforation 1209.00 1210.00 13
1993-09-13 Fracture 1209.00 1210.00 0
1996-06-19 Packing Device Capped w/Cement 1192.00 1200.00 0
1996-06-22 Perforation 1037.20 1038.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2074 0.0 0.0 0.0
1994 8607 0.0 0.0 0.0
1995 8670 0.0 0.0 0.0
1996 4047 0.0 0.0 0.0

For data sources see[5]

References