X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595062705000

Well Details

Well ID: 0595062705000
Loading map...
Location: 00/05-27-059-06W5/0
Location Alias: 00/05-27-59-06 W5M
Location Alias 2: 00/05-27-059-06 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 06
Section: 27
County/Municipality: County of Barrhead No. 11
Well Name: ENRON ET AL GREENCOURT 5-27-59-6
Operator Name: InPlay Oil Corp.
License Number: 0138926
License Date: 1989-02-22
License Status: Abandoned
Spud Date: 1989-02-24
Final Drill Date: 1989-03-02
Well Total Depth: 1254.00 m
Surface Hole Latitude: 54.127753
Surface Hole Longitude: -114.821810

For data sources see[1][2]

Well History

Date Event
1989-02-22 Obtained License
1989-02-26 Surface Casing Operation Performed
1989-03-02 Finished Drilling
1989-03-02 Well Log Performed
1989-03-02 Well Mode changed to Drilled and Cased
1989-03-03 Blowout Occurred
1989-03-03 Production Casing Operation Performed
1989-03-03 Well Log Performed
1989-03-04 Perforation Treatment Performed - Jet Perforation
1989-03-04 Perforation Treatment Performed - Remedial Casing
1989-03-04 Rig Released
1989-03-26 Well Log Performed
1989-03-27 Well Log Performed
1989-03-28 Perforation Treatment Performed - Jet Perforation
1989-03-30 Perforation Treatment Performed - Remedial Casing
1989-04-02 Well Log Performed
1989-04-03 Perforation Treatment Performed - Jet Perforation
1989-06-03 Well Began Production
1989-06-03 Well Fluid changed to Gas
1989-06-03 Well Mode changed to Flowing
1989-06-05 Well Log Performed
1997-12-04 Well Log Performed
1997-12-05 Perforation Treatment Performed - Jet Perforation
1997-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-07 Well Log Performed
1997-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-08 Plug Back Performed
1997-12-10 Well Log Performed
1997-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-11 Plug Back Performed
1997-12-11 Well Abandoned
1997-12-11 Well Fluid changed to Gas
1997-12-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-03-04 Perforation 431.00 431.30 13
1989-03-04 Remedial Casing Cementing 431.00 431.30 0
1989-03-28 Perforation 287.00 287.20 13
1989-03-30 Remedial Casing Cementing 287.00 287.20 0
1989-04-03 Perforation 1015.00 1017.00 13
1997-12-05 Perforation 1222.00 1224.00 14
1997-12-06 Acid Treatment 1222.00 1224.00 0
1997-12-08 Packing Device Capped w/Cement 1212.00 1220.00 0
1997-12-11 Packing Device Capped w/Cement 1004.00 1012.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 4994 0.0 0.0 0.0
1990 8402 0.0 0.0 0.0
1991 8118 0.0 0.0 0.0
1992 8613 0.0 0.0 0.0
1993 6653 0.0 0.0 0.0
1994 7730 0.0 0.0 0.0
1995 8579 0.0 0.0 0.0
1996 8397 0.0 0.0 0.0
1997 942 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-03-03 Blowout 357.00 357.00

For data sources see[6]

References