If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595060511000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.075373,"lon":-114.865188,"icon":""}]} |
Location: 00/11-05-059-06W5/0 | |
Location Alias: 00/11-05-59-06 W5M | |
Location Alias 2: 00/11-05-059-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 06 | |
Section: 05 | |
County/Municipality: Lac Ste. Anne County | |
Well Name: CVE HELDAR 11-5-59-6 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0117173 | |
License Date: 1985-08-23 | |
License Status: Abandoned | |
Spud Date: 1985-08-28 | |
Final Drill Date: 1985-09-05 | |
Well Total Depth: 1319.00 m | |
Surface Hole Latitude: 54.075373 | |
Surface Hole Longitude: -114.865188 |
Date | Event |
---|---|
1985-08-23 | Obtained License |
1985-08-29 | Surface Casing Operation Performed |
1985-09-05 | Finished Drilling |
1985-09-06 | Well Log Performed |
1985-09-07 | Drill Stem Test Performed |
1985-09-08 | Drill Stem Test Performed |
1985-09-09 | Production Casing Operation Performed |
1985-09-09 | Rig Released |
1985-11-07 | Perforation Treatment Performed - Jet Perforation |
1985-11-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-11-12 | Well Mode changed to Drilled and Cased |
1990-03-01 | Well Began Production |
1990-03-01 | Well Fluid changed to Gas |
1990-03-01 | Well Mode changed to Flowing |
1998-07-16 | Well Fluid changed to Gas |
1998-07-16 | Well Mode changed to Suspended |
1999-10-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-10-18 | Plug Back Performed |
1999-10-19 | Perforation Treatment Performed - Cement Plug |
1999-10-19 | Perforation Treatment Performed - Jet Perforation |
1999-10-19 | Perforation Treatment Performed - Remedial Casing |
1999-10-19 | Well Log Performed |
1999-10-20 | Well Abandoned |
1999-10-20 | Well Fluid changed to Gas |
1999-10-20 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-11-07 | Perforation | 1257.00 | 1263.00 | 13 |
1985-11-09 | Acid Treatment | 1257.00 | 1263.00 | 0 |
1999-10-18 | Packing Device Capped w/Cement | 1239.00 | 1247.00 | 0 |
1999-10-19 | Perforation | 386.00 | 387.00 | 14 |
1999-10-19 | Remedial Casing Cementing | 386.00 | 386.00 | 0 |
1999-10-19 | Cement Plug | 356.00 | 386.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 6989 | 0.0 | 0.0 | 0.0 |
1991 | 8297 | 0.0 | 0.0 | 0.0 |
1992 | 8078 | 0.0 | 0.0 | 0.0 |
1993 | 8599 | 0.0 | 0.0 | 0.0 |
1994 | 7857 | 0.0 | 0.0 | 0.0 |
1995 | 7927 | 0.0 | 0.0 | 0.0 |
1996 | 7454 | 0.0 | 0.0 | 0.0 |
1997 | 7250 | 0.0 | 0.0 | 0.0 |
1998 | 2265 | 0.0 | 0.0 | 0.0 |
For data sources see[5]