If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595053501002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.140745,"lon":-114.63232,"icon":""}]} |
Location: 00/01-35-059-05W5/2 | |
Location Alias: 00/01-35-59-05 W5M | |
Location Alias 2: 00/01-35-059-05 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 05 | |
Section: 35 | |
County/Municipality: County of Barrhead No. 11 | |
Well Name: TETHYS ET AL BARRHEAD 1-35-59-5 | |
Operator Name: TAQA North Ltd. | |
License Number: 0132213 | |
License Date: 1988-02-12 | |
License Status: Suspension | |
Spud Date: 1988-03-07 | |
Final Drill Date: 1988-03-12 | |
Well Total Depth: 1195.00 m | |
Surface Hole Latitude: 54.140745 | |
Surface Hole Longitude: -114.632320 |
Date | Event |
---|---|
1988-02-12 | Obtained License |
1988-03-08 | Surface Casing Operation Performed |
1988-03-09 | Kick Occurred |
1988-03-12 | Finished Drilling |
1988-03-12 | Well Log Performed |
1988-03-13 | Drill Stem Test Performed |
1988-03-14 | Production Casing Operation Performed |
1988-03-14 | Rig Released |
1988-04-09 | Well Log Performed |
1988-04-10 | Well Log Performed |
1988-04-11 | Perforation Treatment Performed - Jet Perforation |
1988-04-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-04-12 | Plug Back Performed |
1988-04-14 | Perforation Treatment Performed - Casing Vent Production |
1988-04-14 | Perforation Treatment Performed - Jet Perforation |
1988-05-09 | Well Mode changed to Drilled and Cased |
1993-08-10 | Well Log Performed |
1993-08-15 | Perforation Treatment Performed - Jet Perforation |
1993-08-15 | Well Log Performed |
1993-08-16 | Perforation Treatment Performed - Cement Squeeze |
1993-08-16 | Perforation Treatment Performed - Jet Perforation |
1993-08-16 | Perforation Treatment Performed - Remedial Casing |
1993-08-16 | Plug Back Performed |
1993-08-16 | Well Log Performed |
1993-08-18 | Perforation Treatment Performed - Cement Squeeze |
1993-08-20 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
1998-07-19 | Well Log Performed |
1998-07-20 | Perforation Treatment Performed - Jet Perforation |
1998-07-23 | Well Began Production |
1998-07-23 | Well Fluid changed to Gas |
1998-07-23 | Well Mode changed to Flowing |
1998-10-28 | Well Log Performed |
1998-10-29 | Perforation Treatment Performed - Jet Perforation |
1998-10-30 | Perforation Treatment Performed - Jet Perforation |
1998-10-31 | Perforation Treatment Performed - Jet Perforation |
1998-10-31 | Well Fluid changed to Gas |
1998-10-31 | Well Mode changed to Suspended |
1999-01-17 | Perforation Treatment Performed - Fractured |
2002-04-05 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-04-11 | Perforation | 1118.00 | 1120.00 | 10 |
1993-08-20 | Casing Patch | 460.00 | 461.00 | 0 |
1998-07-20 | Perforation | 412.00 | 420.00 | 13 |
1998-10-29 | Perforation | 400.50 | 402.00 | 13 |
1998-10-29 | Perforation | 403.00 | 405.00 | 13 |
1998-10-29 | Perforation | 408.50 | 412.50 | 13 |
1998-10-30 | Perforation | 335.70 | 340.70 | 13 |
1998-10-30 | Perforation | 343.00 | 346.00 | 13 |
1998-10-30 | Perforation | 352.00 | 357.00 | 13 |
1998-10-31 | Perforation | 333.00 | 336.00 | 13 |
1998-10-31 | Perforation | 340.00 | 343.00 | 13 |
1988-04-12 | Packing Device Capped w/Cement | 1107.00 | 1115.00 | 0 |
1998-10-31 | Perforation | 349.00 | 351.50 | 13 |
1998-10-31 | Perforation | 402.00 | 403.00 | 13 |
1998-10-31 | Perforation | 405.00 | 408.50 | 13 |
1999-01-17 | Fracture | 1079.00 | 1083.20 | 0 |
1988-04-14 | Perforation | 1074.50 | 1083.20 | 10 |
1988-04-14 | Casing Vent Production | 334.00 | 340.00 | 0 |
1993-08-15 | Perforation | 460.00 | 461.00 | 10 |
1993-08-16 | Cement Squeeze | 334.00 | 340.00 | 0 |
1993-08-16 | Perforation | 330.00 | 331.00 | 10 |
1993-08-16 | Remedial Casing Cementing | 330.00 | 331.00 | 0 |
1993-08-18 | Cement Squeeze | 460.00 | 461.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 2245 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1988-03-09 | Kick | 402.00 | 402.00 |
For data sources see[6]