X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595053501000

Well Details

Well ID: 0595053501000
Loading map...
Location: 00/01-35-059-05W5/0
Location Alias: 00/01-35-59-05 W5M
Location Alias 2: 00/01-35-059-05 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 05
Section: 35
County/Municipality: County of Barrhead No. 11
Well Name: TETHYS ET AL BARRHEAD 1-35-59-5
Operator Name: TAQA North Ltd.
License Number: 0132213
License Date: 1988-02-12
License Status: Suspension
Spud Date: 1988-03-07
Final Drill Date: 1988-03-12
Well Total Depth: 1195.00 m
Surface Hole Latitude: 54.140745
Surface Hole Longitude: -114.632320

For data sources see[1][2]

Well History

Date Event
1988-02-12 Obtained License
1988-03-08 Surface Casing Operation Performed
1988-03-09 Kick Occurred
1988-03-12 Finished Drilling
1988-03-12 Well Log Performed
1988-03-13 Drill Stem Test Performed
1988-03-14 Production Casing Operation Performed
1988-03-14 Rig Released
1988-04-09 Well Log Performed
1988-04-10 Well Log Performed
1988-04-11 Perforation Treatment Performed - Jet Perforation
1988-04-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-04-12 Plug Back Performed
1988-04-14 Perforation Treatment Performed - Casing Vent Production
1988-04-14 Perforation Treatment Performed - Jet Perforation
1988-05-09 Well Mode changed to Drilled and Cased
1993-08-10 Well Log Performed
1993-08-15 Perforation Treatment Performed - Jet Perforation
1993-08-15 Well Log Performed
1993-08-16 Perforation Treatment Performed - Cement Squeeze
1993-08-16 Perforation Treatment Performed - Jet Perforation
1993-08-16 Perforation Treatment Performed - Remedial Casing
1993-08-16 Plug Back Performed
1993-08-16 Well Log Performed
1993-08-16 Well Mode changed to Drilled and Cased
1993-08-18 Perforation Treatment Performed - Cement Squeeze
1993-08-20 Perforation Treatment Performed - Casing Patch (Over Perfs)
1997-01-21 Well Began Production
1997-01-21 Well Fluid changed to Gas
1997-01-21 Well Mode changed to Flowing
1998-07-19 Well Log Performed
1998-07-20 Perforation Treatment Performed - Jet Perforation
1998-07-22 Well Fluid changed to Gas
1998-07-22 Well Mode changed to Suspended
1998-10-28 Well Log Performed
1998-10-29 Perforation Treatment Performed - Jet Perforation
1998-10-30 Perforation Treatment Performed - Jet Perforation
1998-10-31 Perforation Treatment Performed - Jet Perforation
1998-11-08 Well Fluid changed to Gas
1998-11-08 Well Mode changed to Flowing
1999-01-17 Perforation Treatment Performed - Fractured
2002-04-05 Well Fluid changed to Gas
2002-04-05 Well Mode changed to Flowing
2003-01-01 Well Fluid changed to Gas
2003-01-01 Well Mode changed to Pumping
2015-10-01 Well Fluid changed to Gas
2015-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-04-11 Perforation 1118.00 1120.00 10
1993-08-20 Casing Patch 460.00 461.00 0
1998-07-20 Perforation 412.00 420.00 13
1998-10-29 Perforation 400.50 402.00 13
1998-10-29 Perforation 403.00 405.00 13
1998-10-29 Perforation 408.50 412.50 13
1998-10-30 Perforation 335.70 340.70 13
1998-10-30 Perforation 343.00 346.00 13
1998-10-30 Perforation 352.00 357.00 13
1998-10-31 Perforation 333.00 336.00 13
1998-10-31 Perforation 340.00 343.00 13
1988-04-12 Packing Device Capped w/Cement 1107.00 1115.00 0
1998-10-31 Perforation 349.00 351.50 13
1998-10-31 Perforation 402.00 403.00 13
1998-10-31 Perforation 405.00 408.50 13
1999-01-17 Fracture 1079.00 1083.20 0
1988-04-14 Perforation 1074.50 1083.20 10
1988-04-14 Casing Vent Production 334.00 340.00 0
1993-08-15 Perforation 460.00 461.00 10
1993-08-16 Cement Squeeze 334.00 340.00 0
1993-08-16 Perforation 330.00 331.00 10
1993-08-16 Remedial Casing Cementing 330.00 331.00 0
1993-08-18 Cement Squeeze 460.00 461.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 7913 0.0 0.0 0.0
1998 5883 0.0 0.0 0.0
1999 8622 0.0 0.0 0.0
2000 8284 0.0 0.0 0.0
2001 8663 0.0 0.0 0.0
2002 8595 0.0 0.0 0.0
2003 8751 0.0 0.0 0.0
2004 8750 0.0 0.0 0.0
2005 8599 0.0 0.0 0.0
2006 8752 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8729 0.0 0.0 0.0
2009 8758 0.0 0.0 0.0
2010 8590 0.0 0.0 0.0
2011 7765 0.0 0.0 0.0
2012 4315 0.0 0.0 0.0
2013 7630 0.0 0.0 0.0
2014 8026 0.0 0.0 0.0
2015 47 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-03-09 Kick 402.00 402.00

For data sources see[6]

References