If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595032911000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.133409,"lon":-114.418549,"icon":""}]} |
Location: 00/11-29-059-03W5/0 | |
Location Alias: 00/11-29-59-03 W5M | |
Location Alias 2: 00/11-29-059-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 03 | |
Section: 29 | |
County/Municipality: County of Barrhead No. 11 | |
Well Name: MURPHY ET AL BARRHEAD 11-29-59-3 | |
Operator Name: Golden Spike Energy Inc. | |
License Number: 0051716 | |
License Date: 1974-11-01 | |
License Status: Abandoned | |
Spud Date: 1974-11-03 | |
Final Drill Date: 1974-11-10 | |
Well Total Depth: 1179.60 m | |
Surface Hole Latitude: 54.133409 | |
Surface Hole Longitude: -114.418549 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1974-11-01 | Obtained License |
1974-11-10 | Finished Drilling |
1974-11-13 | Drill Stem Test Performed |
1974-11-13 | Production Casing Operation Performed |
1974-11-14 | Well Mode changed to Drilled and Cased |
1975-02-01 | Perforation Treatment Performed - Jet Perforation |
1975-02-04 | Perforation Treatment Performed - Jet Perforation |
1980-03-14 | Well Began Production |
1980-03-14 | Well Fluid changed to Gas |
1980-03-14 | Well Mode changed to Flowing |
1982-08-01 | Well Fluid changed to Gas |
1982-08-01 | Well Mode changed to Suspended |
2006-07-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-07-24 | Perforation Treatment Performed - Jet Perforation |
2006-07-24 | Plug Back Performed |
2006-07-24 | Well Fluid changed to Gas |
2006-07-24 | Well Mode changed to Abandoned Zone |
2006-07-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-07-25 | Plug Back Performed |
2006-07-26 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-02-01 | Perforation | 1103.70 | 1104.30 | 10 |
1975-02-01 | Perforation | 1105.80 | 1107.30 | 10 |
1975-02-04 | Perforation | 1045.50 | 1047.30 | 10 |
2006-07-24 | Packing Device Capped w/Cement | 1057.50 | 1065.50 | 0 |
2006-07-24 | Perforation | 374.50 | 375.00 | 17 |
2006-07-25 | Packing Device Capped w/Cement | 1027.00 | 1035.00 | 0 |
2006-07-25 | Packing Device Capped w/Cement | 357.00 | 365.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 3408 | 0.0 | 0.0 | 0.0 |
1981 | 437 | 0.0 | 0.0 | 0.0 |
For data sources see[5]