X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595021814003

Well Details

Well ID: 0595021814003
Loading map...
Location: 00/14-18-059-02W5/3
Location Alias: 00/14-18-59-02 W5M
Location Alias 2: 00/14-18-059-02 W5/03
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 02
Section: 18
County/Municipality: County of Barrhead No. 11
Well Name: AXIOM MANOLA 14-18-59-2
Operator Name: Axiom Oil and Gas Inc.
License Number: 0112330
License Date: 1985-01-08
License Status: Issued
Spud Date: 1985-01-25
Final Drill Date: 1985-01-29
Well Total Depth: 1108.00 m
Surface Hole Latitude: 54.105413
Surface Hole Longitude: -114.290220

For data sources see[1][2]

Well History

Date Event
1985-01-08 Obtained License
1985-01-25 Surface Casing Operation Performed
1985-01-29 Finished Drilling
1985-01-29 Well Mode changed to Drilled and Cased
1985-01-30 Well Log Performed
1985-01-31 Production Casing Operation Performed
1985-01-31 Rig Released
1985-02-06 Well Log Performed
1985-02-07 Well Log Performed
1985-02-08 Perforation Treatment Performed - Jet Perforation
1985-02-09 Perforation Treatment Performed - Fractured
1985-06-06 Well Log Performed
1985-06-08 Well Log Performed
1985-06-09 Perforation Treatment Performed - Jet Perforation
1985-06-14 Perforation Treatment Performed - Fractured
1989-05-09 Perforation Treatment Performed - Jet Perforation
1989-05-09 Perforation Treatment Performed - Remedial Casing
1989-05-09 Well Log Performed
1992-02-16 Well Began Injection
1992-02-16 Well Fluid changed to Water
1992-02-16 Well Type changed to Disposal
1992-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-12-11 Perforation Treatment Performed - Jet Perforation
1992-12-11 Plug Back Performed
1992-12-14 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-02-08 Perforation 1080.50 1082.00 7
1985-02-08 Perforation 1083.00 1087.00 7
1985-02-09 Fracture 1080.50 1087.00 0
1985-06-09 Perforation 1071.00 1074.00 13
1985-06-14 Fracture 1071.00 1074.00 0
1989-05-09 Perforation 335.00 336.00 13
1989-05-09 Remedial Casing Cementing 335.00 336.00 0
1992-12-11 Packing Device Capped w/Cement 1056.00 1064.00 0
1992-12-11 Perforation 849.00 854.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References