If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0594203615000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.148046,"lon":-112.861537,"icon":""}]} |
Location: 00/15-36-059-20W4/0 | |
Location Alias: 00/15-36-59-20 W4M | |
Location Alias 2: 00/15-36-059-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 4 | |
Range: 20 | |
Section: 36 | |
County/Municipality: Thorhild County | |
Well Name: GREY WOLF RADWAY 15-36-59-20 | |
Operator Name: Insignia Energy Ltd. | |
License Number: 0162926 | |
License Date: 1993-12-07 | |
License Status: Abandoned | |
Spud Date: 1993-12-08 | |
Final Drill Date: 1993-12-11 | |
Well Total Depth: 738.00 m | |
Surface Hole Latitude: 54.148046 | |
Surface Hole Longitude: -112.861537 |
Date | Event |
---|---|
1993-12-07 | Obtained License |
1993-12-09 | Surface Casing Operation Performed |
1993-12-11 | Finished Drilling |
1993-12-11 | Well Log Performed |
1993-12-11 | Well Mode changed to Drilled and Cased |
1993-12-12 | Drill Stem Test Performed |
1993-12-12 | Well Log Performed |
1993-12-13 | Production Casing Operation Performed |
1993-12-13 | Rig Released |
1994-05-17 | Perforation Treatment Performed - Jet Perforation |
1994-05-18 | Perforation Treatment Performed - Bridge Plug No Cement Required |
1994-06-10 | Well Began Production |
1994-06-10 | Well Fluid changed to Gas |
1994-06-10 | Well Mode changed to Flowing |
1995-02-28 | Well Fluid changed to Gas |
1995-02-28 | Well Mode changed to Suspended |
1995-06-01 | Well Fluid changed to Gas |
1995-06-01 | Well Mode changed to Flowing |
1997-05-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-05-15 | Perforation Treatment Performed - Jet Perforation |
1997-05-15 | Plug Back Performed |
1997-05-15 | Well Fluid changed to Gas |
1997-05-15 | Well Log Performed |
1997-05-15 | Well Mode changed to Abandoned Zone |
1998-06-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-06-25 | Perforation Treatment Performed - Cement Squeeze |
1998-06-25 | Plug Back Performed |
1998-07-01 | Well Log Performed |
1998-07-02 | Perforation Treatment Performed - Jet Perforation |
1998-09-22 | Well Log Performed |
1998-09-23 | Perforation Treatment Performed - Jet Perforation |
1998-09-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-10-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-10-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-10-13 | Well Log Performed |
2000-10-14 | Well Log Performed |
2000-10-16 | Perforation Treatment Performed - Jet Perforation |
2000-10-16 | Perforation Treatment Performed - Remedial Casing |
2000-10-18 | Perforation Treatment Performed - Jet Perforation |
2000-10-18 | Perforation Treatment Performed - Remedial Casing |
2000-11-08 | Well Log Performed |
2000-11-09 | Perforation Treatment Performed - Jet Perforation |
2000-11-09 | Perforation Treatment Performed - Remedial Casing |
2001-08-24 | Perforation Treatment Performed - Jet Perforation |
2001-08-24 | Perforation Treatment Performed - Remedial Casing |
2001-08-24 | Well Log Performed |
2001-09-23 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-05-17 | Perforation | 722.00 | 723.50 | 13 |
1998-09-24 | Acid Treatment | 722.00 | 726.00 | 0 |
2000-10-12 | Packing Device Capped w/Cement | 711.00 | 719.00 | 0 |
2000-10-13 | Packing Device Capped w/Cement | 668.00 | 677.00 | 0 |
2000-10-16 | Perforation | 407.00 | 408.00 | 13 |
2000-10-16 | Remedial Casing Cementing | 407.00 | 408.00 | 0 |
2000-10-18 | Perforation | 280.00 | 281.00 | 13 |
2000-10-18 | Remedial Casing Cementing | 280.00 | 281.00 | 0 |
2000-11-09 | Perforation | 185.00 | 186.00 | 13 |
2000-11-09 | Remedial Casing Cementing | 185.00 | 186.00 | 0 |
2001-08-24 | Perforation | 154.00 | 155.00 | 13 |
1994-05-18 | Bridge Plug, No Cement | 722.00 | 723.50 | 0 |
2001-08-24 | Remedial Casing Cementing | 154.00 | 155.00 | 0 |
1997-05-15 | Packing Device Capped w/Cement | 707.00 | 715.00 | 0 |
1997-05-15 | Perforation | 674.00 | 677.00 | 13 |
1997-05-15 | Perforation | 668.00 | 670.00 | 13 |
1998-06-25 | Acid Treatment | 668.00 | 677.00 | 0 |
1998-06-25 | Cement Squeeze | 668.00 | 677.00 | 0 |
1998-07-02 | Perforation | 722.00 | 723.50 | 14 |
1998-09-23 | Perforation | 723.50 | 726.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 4785 | 0.0 | 0.0 | 0.0 |
1995 | 6437 | 0.0 | 0.0 | 0.0 |
1996 | 8282 | 0.0 | 0.0 | 0.0 |
1997 | 2588 | 0.0 | 0.0 | 0.0 |
For data sources see[5]