X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0594203006002

Well Details

Well ID: 0594203006002
Loading map...
Location: 00/06-30-059-20W4/2
Location Alias: 00/06-30-59-20 W4M
Location Alias 2: 00/06-30-059-20 W4/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 4
Range: 20
Section: 30
County/Municipality: Thorhild County
Well Name: PEOC RADWAY 6-30-59-20
Operator Name: Sequoia Resources Corp.
License Number: 0145507
License Date: 1990-09-21
License Status: Suspension
Spud Date: 1990-09-27
Final Drill Date: 1990-09-30
Well Total Depth: 775.00 m
Surface Hole Latitude: 54.126060
Surface Hole Longitude: -112.992489

For data sources see[1][2]

Well History

Date Event
1990-09-21 Obtained License
1990-09-28 Surface Casing Operation Performed
1990-09-30 Finished Drilling
1990-09-30 Well Log Performed
1990-09-30 Well Mode changed to Drilled and Cased
1990-10-01 Well Log Performed
1990-10-02 Production Casing Operation Performed
1990-10-02 Rig Released
1991-03-27 Well Log Performed
1991-03-28 Perforation Treatment Performed - Jet Perforation
1991-03-28 Well Log Performed
1993-08-19 Perforation Treatment Performed - Cement Squeeze
1993-08-19 Perforation Treatment Performed - Jet Perforation
1993-08-22 Perforation Treatment Performed - Jet Perforation
1995-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-26 Perforation Treatment Performed - Jet Perforation
1995-10-26 Plug Back Performed
1995-10-26 Well Began Production
1995-10-26 Well Fluid changed to Gas
1995-10-26 Well Log Performed
1995-10-26 Well Mode changed to Flowing
1996-02-01 Well Fluid changed to Gas
1996-02-01 Well Mode changed to Suspended
2000-01-06 Well Fluid changed to Gas
2000-01-06 Well Mode changed to Flowing
2006-09-15 Well Fluid changed to Gas
2006-09-15 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-03-28 Perforation 751.50 753.00 20
1991-03-28 Perforation 756.00 757.00 20
1993-08-19 Perforation 759.00 760.00 13
1993-08-19 Cement Squeeze 751.50 757.00 0
1993-08-22 Perforation 751.00 753.00 14
1995-10-26 Packing Device Capped w/Cement 735.00 743.00 0
1995-10-26 Perforation 667.50 668.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1425 0.0 0.0 0.0
2000 415 0.0 0.0 0.0

For data sources see[5]

References