X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0594161111000

Well Details

Well ID: 0594161111000
Loading map...
Location: 00/11-11-059-16W4/0
Location Alias: 00/11-11-59-16 W4M
Location Alias 2: 00/11-11-059-16 W4/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 4
Range: 16
Section: 11
County/Municipality: Smoky Lake County
Well Name: CNRL BELLIS 11-11-59-16
Operator Name: Canadian Natural Resources Limited
License Number: 0057559
License Date: 1976-03-15
License Status: Suspension
Spud Date: 1976-03-20
Final Drill Date: 1976-03-23
Well Total Depth: 606.60 m
Surface Hole Latitude: 54.087906
Surface Hole Longitude: -112.291410

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-03-15 Obtained License
1976-03-23 Finished Drilling
1976-03-24 Drill Stem Test Performed
1976-03-25 Production Casing Operation Performed
1976-05-20 Perforation Treatment Performed - Open-Hole Completion
1976-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-05-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-05-23 Perforation Treatment Performed - Jet Perforation
1976-06-04 Well Mode changed to Drilled and Cased
1976-12-30 Well Began Production
1976-12-30 Well Fluid changed to Gas
1976-12-30 Well Mode changed to Flowing
1985-10-29 Perforation Treatment Performed - Jet Perforation
1985-12-21 Perforation Treatment Performed - Cement Squeeze
1985-12-31 Perforation Treatment Performed - Jet Perforation
1999-09-26 Perforation Treatment Performed - Jet Perforation
1999-09-26 Well Log Performed
1999-09-28 Well Fluid changed to Gas
1999-09-28 Well Mode changed to Flowing
2003-07-31 Well Fluid changed to Gas
2003-07-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-05-20 Open Hole/Barefoot Completion 605.30 606.20 0
1999-09-26 Perforation 536.50 538.00 20
1999-09-26 Perforation 539.50 541.00 20
1976-05-21 Acid Treatment 605.30 606.20 0
1976-05-23 Packing Device Capped w/Cement 571.50 582.20 0
1976-05-23 Perforation 479.50 480.40 13
1976-05-23 Perforation 485.50 486.50 13
1985-10-29 Perforation 481.30 483.40 13
1985-12-21 Cement Squeeze 479.50 483.40 0
1985-12-31 Perforation 479.40 480.30 13
1985-12-31 Perforation 485.50 486.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 57 0.0 0.0 0.0
1977 7060 0.0 0.0 0.0
1978 8291 0.0 0.0 0.0
1979 6367 0.0 0.0 0.0
1980 4184 0.0 0.0 0.0
1981 8361 0.0 0.0 0.0
1982 7087 0.0 0.0 0.0
1983 5998 0.0 0.0 0.0
1984 5994 0.0 0.0 0.0
1985 4033 0.0 0.0 0.0
1986 5682 0.0 0.0 0.0
1987 7408 0.0 0.0 0.0
1988 8048 0.0 0.0 0.0
1989 5979 0.0 0.0 0.0
1990 8487 0.0 0.0 0.0
1991 8268 0.0 0.0 0.0
1992 8204 0.0 0.0 0.0
1993 8298 0.0 0.0 0.0
1994 7333 0.0 0.0 0.0
1995 8205 0.0 0.0 0.0
1996 8285 0.0 0.0 0.0
1997 8336 0.0 0.0 0.0
1998 8070 0.0 0.0 0.0
1999 6054 0.0 0.0 0.0

For data sources see[5]

References