If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0594153516002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.149675,"lon":-112.129368,"icon":""}]} |
Location: 00/16-35-059-15W4/2 | |
Location Alias: 00/16-35-59-15 W4M | |
Location Alias 2: 00/16-35-059-15 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 4 | |
Range: 15 | |
Section: 35 | |
County/Municipality: Smoky Lake County | |
Well Name: CNRL BELLIS 16-35-59-15 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0024983 | |
License Date: 1963-10-18 | |
License Status: Abandoned | |
Spud Date: 1963-10-25 | |
Final Drill Date: 1963-10-31 | |
Well Total Depth: 914.40 m | |
Surface Hole Latitude: 54.149675 | |
Surface Hole Longitude: -112.129368 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1963-10-18 | Obtained License |
1963-10-31 | Finished Drilling |
1963-10-31 | Well Mode changed to Drilled and Cased |
1963-11-02 | Production Casing Operation Performed |
1969-08-12 | Perforation Treatment Performed - Jet Perforation |
1969-08-13 | Perforation Treatment Performed - Cement Squeeze |
1969-08-14 | Perforation Treatment Performed - Jet Perforation |
1969-08-16 | Perforation Treatment Performed - Jet Perforation |
1970-09-22 | Well Began Production |
1970-09-22 | Well Fluid changed to Gas |
1970-09-22 | Well Mode changed to Flowing |
1971-02-03 | Well Fluid changed to Gas |
1971-02-03 | Well Mode changed to Flowing |
1989-03-26 | Perforation Treatment Performed - Jet Perforation |
1989-03-26 | Well Log Performed |
1998-08-03 | Well Log Performed |
2002-04-30 | Well Fluid changed to Gas |
2002-04-30 | Well Mode changed to Suspended |
2006-12-14 | Perforation Treatment Performed - Cement Squeeze |
2006-12-14 | Plug Back Performed |
2006-12-14 | Well Fluid changed to Gas |
2006-12-14 | Well Mode changed to Abandoned Zone |
2007-01-08 | Perforation Treatment Performed - Jet Perforation |
2011-08-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-08-06 | Plug Back Performed |
2011-08-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-08-08 | Well Log Performed |
2011-08-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-08-10 | Perforation Treatment Performed - Jet Perforation |
2011-08-10 | Well Log Performed |
2011-08-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-08-11 | Perforation Treatment Performed - Remedial Casing |
2011-08-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-08-12 | Perforation Treatment Performed - Jet Perforation |
2011-08-12 | Perforation Treatment Performed - Remedial Casing |
2011-08-12 | Well Log Performed |
2011-08-23 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1969-08-12 | Perforation | 630.90 | 635.20 | 3 |
2006-12-14 | Cement Squeeze | 508.50 | 551.40 | 0 |
2007-01-08 | Perforation | 601.20 | 604.30 | 17 |
2011-08-06 | Packing Device Capped w/Cement | 587.00 | 595.00 | 0 |
2011-08-07 | Packing Device Capped w/Cement | 537.00 | 545.00 | 0 |
2011-08-10 | Packing Device Capped w/Cement | 496.00 | 504.00 | 0 |
2011-08-10 | Perforation | 281.00 | 284.00 | 17 |
2011-08-11 | Remedial Casing Cementing | 281.00 | 284.00 | 0 |
2011-08-11 | Packing Device Capped w/Cement | 364.00 | 376.00 | 0 |
2011-08-12 | Perforation | 204.00 | 205.00 | 17 |
2011-08-12 | Remedial Casing Cementing | 204.00 | 205.00 | 0 |
1969-08-12 | Perforation | 621.50 | 623.60 | 3 |
2011-08-12 | Packing Device Capped w/Cement | 58.50 | 210.00 | 0 |
1969-08-13 | Cement Squeeze | 621.50 | 635.20 | 0 |
1969-08-14 | Perforation | 549.90 | 551.70 | 3 |
1969-08-14 | Perforation | 515.10 | 516.90 | 3 |
1969-08-16 | Perforation | 509.00 | 513.90 | 3 |
1989-03-26 | Perforation | 509.00 | 513.90 | 13 |
1989-03-26 | Perforation | 514.30 | 516.30 | 13 |
1989-03-26 | Perforation | 549.20 | 551.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1971 | 3794 | 0.0 | 0.0 | 0.0 |
1972 | 6711 | 0.0 | 0.0 | 0.0 |
1973 | 6834 | 0.0 | 0.0 | 0.0 |
1974 | 8562 | 0.0 | 0.0 | 0.0 |
1975 | 8400 | 0.0 | 0.0 | 0.0 |
1976 | 5706 | 0.0 | 0.0 | 0.0 |
1977 | 1857 | 0.0 | 0.0 | 0.0 |
1978 | 1253 | 0.0 | 0.0 | 0.0 |
1979 | 4223 | 0.0 | 0.0 | 0.0 |
1980 | 7875 | 0.0 | 0.0 | 0.0 |
1981 | 4175 | 0.0 | 0.0 | 0.0 |
1982 | 2897 | 0.0 | 0.0 | 0.0 |
1983 | 3332 | 0.0 | 0.0 | 0.0 |
1984 | 6587 | 0.0 | 0.0 | 0.0 |
1985 | 6393 | 0.0 | 0.0 | 0.0 |
1986 | 6175 | 0.0 | 0.0 | 0.0 |
1987 | 8403 | 0.0 | 0.0 | 0.0 |
1988 | 6198 | 0.0 | 0.0 | 0.0 |
1989 | 4396 | 0.0 | 0.0 | 0.0 |
1990 | 1419 | 0.0 | 0.0 | 0.0 |
1991 | 1419 | 0.0 | 0.0 | 0.0 |
1992 | 1229 | 0.0 | 0.0 | 0.0 |
1993 | 7282 | 0.0 | 0.0 | 0.0 |
1994 | 5232 | 0.0 | 0.0 | 0.0 |
1995 | 6226 | 0.0 | 0.0 | 0.0 |
1996 | 3069 | 0.0 | 0.0 | 0.0 |
1997 | 6019 | 0.0 | 0.0 | 0.0 |
1998 | 5816 | 0.0 | 0.0 | 0.0 |
1999 | 8122 | 0.0 | 0.0 | 0.0 |
2000 | 3958 | 0.0 | 0.0 | 0.0 |
2001 | 356 | 0.0 | 0.0 | 0.0 |
For data sources see[5]