X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0594150907002

Well Details

Well ID: 0594150907002
Loading map...
Location: 00/07-09-059-15W4/2
Location Alias: 00/07-09-59-15 W4M
Location Alias 2: 00/07-09-059-15 W4/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 4
Range: 15
Section: 09
County/Municipality: Smoky Lake County
Well Name: CNRL ET AL WHITFORD 7-9-59-15
Operator Name: Canadian Natural Resources Limited
License Number: 0170023
License Date: 1994-08-30
License Status: RecCertified
Spud Date: 1994-09-20
Final Drill Date: 1994-09-24
Well Total Depth: 613.00 m
Surface Hole Latitude: 54.084649
Surface Hole Longitude: -112.184273

For data sources see[1][2]

Well History

Date Event
1994-08-30 Obtained License
1994-09-21 Surface Casing Operation Performed
1994-09-22 Direction Drilling Operation Performed - Deviate
1994-09-24 Finished Drilling
1994-09-24 Well Log Performed
1994-09-24 Well Mode changed to Drilled and Cased
1994-09-25 Production Casing Operation Performed
1994-09-26 Rig Released
1994-10-04 Perforation Treatment Performed - Jet Perforation
1994-10-04 Well Log Performed
1994-10-05 Perforation Treatment Performed - Jet Perforation
1994-12-10 Perforation Treatment Performed - Jet Perforation
1995-04-10 Well Log Performed
1995-11-21 Perforation Treatment Performed - Cement Squeeze
1995-11-24 Perforation Treatment Performed - Jet Perforation
1995-11-25 Perforation Treatment Performed - Jet Perforation
1996-12-01 Well Fluid changed to Gas
1996-12-01 Well Mode changed to Testing
1996-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-12-02 Plug Back Performed
1996-12-02 Well Fluid changed to Gas
1996-12-02 Well Log Performed
1996-12-02 Well Mode changed to Abandoned Zone
1996-12-03 Perforation Treatment Performed - Jet Perforation
1996-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-12-05 Plug Back Performed
1996-12-12 Well Log Performed
2003-11-16 Well Abandoned
2003-11-16 Well Fluid changed to Gas
2003-11-16 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-09-22 177.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-10-04 Perforation 588.50 590.00 18
1996-12-05 Packing Device Capped w/Cement 539.00 547.00 0
1996-12-05 Packing Device Capped w/Cement 461.00 469.00 0
1994-10-05 Perforation 477.00 478.00 19
1994-12-10 Perforation 588.50 590.00 18
1995-11-21 Cement Squeeze 588.50 590.00 0
1995-11-24 Perforation 584.50 586.00 13
1995-11-25 Perforation 584.50 586.00 13
1996-12-02 Packing Device Capped w/Cement 569.00 577.00 0
1996-12-03 Perforation 556.50 559.00 18
1996-12-03 Perforation 477.00 478.20 18

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 824 0.0 0.0 0.0
1996 478 0.0 0.0 0.0

For data sources see[6]

References