X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0594150716000

Well Details

Well ID: 0594150716000
Loading map...
Location: 00/16-07-059-15W4/0
Location Alias: 00/16-07-59-15 W4M
Location Alias 2: 00/16-07-059-15 W4/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 4
Range: 15
Section: 07
County/Municipality: Smoky Lake County
Well Name: CNRL ET AL WHITFORD 16-7-59-15
Operator Name: Canadian Natural Resources Limited
License Number: 0107272
License Date: 1984-05-24
License Status: Abandoned
Spud Date: 1984-05-27
Final Drill Date: 1984-05-30
Well Total Depth: 657.00 m
Surface Hole Latitude: 54.090185
Surface Hole Longitude: -112.231256

For data sources see[1][2]

Well History

Date Event
1984-05-24 Obtained License
1984-05-27 Lost Circulation Occurred
1984-05-29 Lost Circulation Occurred
1984-05-30 Finished Drilling
1984-05-30 Well Log Performed
1984-05-31 Drill Stem Test Performed
1984-06-01 Drill Stem Test Performed
1984-06-03 Production Casing Operation Performed
1984-06-03 Well Mode changed to Drilled and Cased
1985-05-16 Well Log Performed
1985-05-17 Well Log Performed
1985-05-18 Perforation Treatment Performed - Jet Perforation
1985-05-18 Well Log Performed
1985-05-19 Perforation Treatment Performed - Cement Squeeze
1985-05-21 Perforation Treatment Performed - Cement Squeeze
1985-05-21 Well Log Performed
1985-05-22 Perforation Treatment Performed - Jet Perforation
1985-05-23 Perforation Treatment Performed - Jet Perforation
1985-10-01 Well Began Production
1985-10-01 Well Fluid changed to Gas
1985-10-01 Well Mode changed to Flowing
1989-01-20 Perforation Treatment Performed - Jet Perforation
1989-01-20 Well Fluid changed to Gas
1989-01-20 Well Log Performed
1989-01-20 Well Mode changed to Flowing
1992-03-04 Well Fluid changed to Gas
1992-03-04 Well Mode changed to Suspended
1992-06-28 Perforation Treatment Performed - Jet Perforation
1992-06-28 Well Log Performed
1992-06-29 Perforation Treatment Performed - Jet Perforation
1992-06-29 Well Log Performed
1992-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-30 Perforation Treatment Performed - Cement Squeeze
1992-07-23 Well Fluid changed to Gas
1992-07-23 Well Mode changed to Suspended
1998-10-14 Well Log Performed
1998-10-16 Perforation Treatment Performed - Jet Perforation
1998-10-16 Well Log Performed
1998-10-17 Well Log Performed
1998-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-10-20 Perforation Treatment Performed - Jet Perforation
1998-10-20 Well Log Performed
1998-10-27 Well Log Performed
1998-10-28 Perforation Treatment Performed - Cement Squeeze
1998-10-28 Plug Back Performed
2000-02-25 Well Log Performed
2000-02-26 Perforation Treatment Performed - Jet Perforation
2000-02-26 Well Log Performed
2000-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-27 Perforation Treatment Performed - Jet Perforation
2000-02-27 Plug Back Performed
2000-02-27 Well Fluid changed to Gas
2000-02-27 Well Mode changed to Abandoned Zone
2000-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-28 Perforation Treatment Performed - Remedial Casing
2000-02-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-29 Perforation Treatment Performed - Cement Plug
2000-02-29 Perforation Treatment Performed - Remedial Casing
2000-03-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-05-18 Perforation 467.00 468.00 13
1992-06-30 Acid Treatment 505.50 506.10 0
1992-06-30 Cement Squeeze 505.00 506.10 0
1998-10-16 Perforation 427.50 428.50 13
1998-10-20 Perforation 217.00 218.00 13
1998-10-20 Acid Treatment 217.00 218.00 13
1998-10-28 Cement Squeeze 427.50 428.50 0
2000-02-26 Perforation 434.00 435.00 13
2000-02-26 Perforation 437.50 439.00 13
2000-02-27 Packing Device Capped w/Cement 412.00 420.00 0
2000-02-27 Perforation 189.00 190.00 13
1985-05-19 Cement Squeeze 467.00 468.00 0
2000-02-28 Acid Treatment 189.00 190.00 0
2000-02-28 Remedial Casing Cementing 189.00 218.00 0
2000-02-29 Acid Treatment 168.40 169.40 0
2000-02-29 Remedial Casing Cementing 168.40 169.40 0
2000-02-29 Cement Plug 123.50 169.40 0
1985-05-21 Cement Squeeze 467.00 468.00 0
1985-05-22 Perforation 437.50 439.00 13
1985-05-22 Perforation 434.00 435.00 13
1985-05-23 Perforation 427.50 429.50 13
1989-01-20 Perforation 505.50 506.10 13
1992-06-28 Perforation 573.00 576.00 13
1992-06-29 Perforation 548.00 550.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1392 0.0 0.0 0.0
1986 3546 0.0 0.0 0.0
1987 5441 0.0 0.0 0.0
1988 5355 0.0 0.0 0.0
1989 3588 0.0 0.0 0.0
1990 3705 0.0 0.0 0.0
1991 4026 0.0 0.0 0.0
1992 641 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-05-27 Lost Circulation 65.00 75.00
1984-05-29 Lost Circulation 585.00 585.00

For data sources see[6]

References