X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0594150311020

Well Details

Well ID: 0594150311020
Loading map...
Location: 02/11-03-059-15W4/0
Location Alias: 02/11-03-59-15 W4M
Location Alias 2: 02/11-03-059-15 W4/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 4
Range: 15
Section: 03
County/Municipality: Smoky Lake County
Well Name: ACL WHITFORD 11-3-59-15
Operator Name: Paramount Resources Ltd.
License Number: 0130602
License Date: 1987-12-11
License Status: Suspension
Spud Date: 1988-01-14
Final Drill Date: 1988-01-16
Well Total Depth: 645.00 m
Surface Hole Latitude: 54.073630
Surface Hole Longitude: -112.169299

For data sources see[1][2]

Well History

Date Event
1987-12-11 Obtained License
1988-01-15 Surface Casing Operation Performed
1988-01-16 Finished Drilling
1988-01-16 Lost Circulation Occurred
1988-01-17 Kick Occurred
1988-01-19 Production Casing Operation Performed
1988-01-19 Well Log Performed
1988-01-20 Rig Released
1988-01-21 Well Log Performed
1988-01-22 Perforation Treatment Performed - Jet Perforation
1988-01-22 Perforation Treatment Performed - Remedial Casing
1988-01-24 Perforation Treatment Performed - Open-Hole Completion
1988-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-01-25 Perforation Treatment Performed - Jet Perforation
1988-01-25 Plug Back Performed
1988-01-26 Perforation Treatment Performed - Jet Perforation
1988-02-10 Well Mode changed to Drilled and Cased
1991-10-08 Well Began Production
1991-10-08 Well Fluid changed to Gas
1991-10-08 Well Mode changed to Flowing
1991-10-28 Perforation Treatment Performed - Cement Squeeze
1991-10-30 Perforation Treatment Performed - Jet Perforation
2015-11-23 Well Fluid changed to Gas
2015-11-23 Well Mode changed to Suspended
2020-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-23 Plug Back Performed
2020-01-23 Well Fluid changed to Gas
2020-01-23 Well Mode changed to Abandoned Zone
2020-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-24 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-01-22 Perforation 420.00 420.50 13
1991-10-28 Cement Squeeze 502.50 506.00 0
1991-10-30 Perforation 502.50 503.50 13
1991-10-30 Perforation 504.00 505.00 13
2020-01-23 Packing Device Capped w/Cement 571.20 581.20 0
2020-01-23 Packing Device Capped w/Cement 484.60 494.60 0
2020-01-24 Packing Device Capped w/Cement 402.00 412.00 0
1988-01-22 Remedial Casing Cementing 420.00 420.50 0
1988-01-24 Open Hole/Barefoot Completion 632.60 642.50 0
1988-01-25 Packing Device Capped w/Cement 622.00 625.00 0
1988-01-25 Perforation 620.00 621.00 13
1988-01-25 Packing Device Capped w/Cement 610.00 618.00 0
1988-01-25 Perforation 588.00 590.00 13
1988-01-26 Perforation 502.50 503.50 13
1988-01-26 Perforation 504.00 506.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 1917 0.0 0.0 0.0
1992 8334 0.0 0.0 0.0
1993 8737 0.0 0.0 0.0
1994 7610 0.0 0.0 0.0
1995 8734 0.0 0.0 0.0
1996 8727 0.0 0.0 0.0
1997 8615 0.0 0.0 0.0
1998 8710 0.0 0.0 0.0
1999 8745 0.0 0.0 0.0
2000 8755 0.0 0.0 0.0
2001 8598 0.0 0.0 0.0
2002 8715 0.0 0.0 0.0
2003 8336 0.0 0.0 0.0
2004 8779 0.0 0.0 0.0
2005 8741 0.0 0.0 0.0
2006 8452 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8778 0.0 0.0 0.0
2009 8582 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 6638 0.0 0.0 0.0
2012 8659 0.0 0.0 0.0
2013 8668 0.0 0.0 0.0
2014 6552 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-01-16 Lost Circulation 645.00 645.00
1988-01-17 Kick 645.00 645.00
2020-01-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References