X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0594051905000

Well Details

Well ID: 0594051905000
Loading map...
Location: 00/05-19-059-05W4/0
Location Alias: 00/05-19-59-05 W4M
Location Alias 2: 00/05-19-059-05 W4/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 4
Range: 05
Section: 19
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: BAYTEX KEHIWIN 5-19-59-5
Operator Name: Baytex Energy Ltd.
License Number: 0052924
License Date: 1975-02-14
License Status: Suspension
Spud Date: 1975-02-16
Final Drill Date: 1975-02-17
Well Total Depth: 557.20 m
Surface Hole Latitude: 54.111639
Surface Hole Longitude: -110.749962

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-02-14 Obtained License
1975-02-17 Finished Drilling
1975-02-18 Drill Stem Test Performed
1975-02-19 Production Casing Operation Performed
1975-10-07 Well Mode changed to Drilled and Cased
1975-10-08 Perforation Treatment Performed - Jet Perforation
1998-02-06 Well Began Production
1998-02-06 Well Fluid changed to Gas
1998-02-06 Well Mode changed to Flowing
2000-03-05 Perforation Treatment Performed - Jet Perforation
2000-09-05 Perforation Treatment Performed - Bridge Plug No Cement Required
2000-09-05 Perforation Treatment Performed - Jet Perforation
2000-09-15 Well Fluid changed to Gas
2000-09-15 Well Mode changed to Suspended
2002-12-13 Well Fluid changed to Gas
2002-12-13 Well Mode changed to Flowing
2006-04-01 Well Fluid changed to Gas
2006-04-01 Well Mode changed to Suspended
2019-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-11-26 Plug Back Performed
2019-11-26 Well Fluid changed to Gas
2019-11-26 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-10-08 Perforation 353.90 354.80 13
2000-03-05 Perforation 353.90 354.40 20
2000-09-05 Bridge Plug, No Cement 345.00 345.00 0
2000-09-05 Perforation 311.50 313.90 13
2000-09-05 Perforation 314.50 315.80 13
2000-09-05 Perforation 317.90 318.50 13
2019-11-26 Packing Device Capped w/Cement 300.00 308.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 7089 0.0 0.0 0.0
1999 8673 0.0 0.0 0.0
2000 1542 0.0 0.0 0.0
2002 454 0.0 0.0 0.0
2003 2873 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-11-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References