X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0594031702020

Well Details

Well ID: 0594031702020
Loading map...
Location: 02/02-17-059-03W4/0
Location Alias: 02/02-17-59-03 W4M
Location Alias 2: 02/02-17-059-03 W4/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 4
Range: 03
Section: 17
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: OMERS ENERGY 102 REITA 2-17-59-3
Operator Name: Crescent Point Energy Corp.
License Number: 0333976
License Date: 2005-07-04
License Status: Suspension
Spud Date: 2005-07-12
Final Drill Date: 2005-07-14
Well Total Depth: 466.00 m
Surface Hole Latitude: 54.096251
Surface Hole Longitude: -110.415501

For data sources see[1][2]

Well History

Date Event
2005-07-04 Obtained License
2005-07-13 Direction Drilling Operation Performed - Deviate
2005-07-13 Surface Casing Operation Performed
2005-07-14 Finished Drilling
2005-07-14 Production Casing Operation Performed
2005-07-14 Rig Released
2005-07-14 Well Log Performed
2005-07-14 Well Mode changed to Drilled and Cased
2005-07-15 Well Log Performed
2005-08-29 Perforation Treatment Performed - Jet Perforation
2005-09-20 Perforation Treatment Performed - Jet Perforation
2005-11-04 Well Began Production
2005-11-04 Well Fluid changed to Gas
2005-11-04 Well Mode changed to Flowing
2011-10-01 Well Fluid changed to Gas
2011-10-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-07-13 117.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-08-29 Perforation 443.50 444.20 17
2005-08-29 Perforation 445.50 446.00 17
2005-09-20 Perforation 418.00 418.50 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 1307 0.0 0.0 0.0
2006 5120 0.0 0.0 0.0
2007 2131 0.0 0.0 0.0
2008 5965 0.0 0.0 0.0
2011 20 0.0 0.0 0.0

For data sources see[6]

References