X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0586030811000

Well Details

Well ID: 0586030811000
Loading map...
Location: 00/11-08-058-03W6/0
Location Alias: 00/11-08-58-03 W6M
Location Alias 2: 00/11-08-058-03 W6/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 6
Range: 03
Section: 08
County/Municipality: Municipal District of Greenview No. 16
Well Name: PEYTO SMOKY 11-8-58-3
Operator Name: Peyto Exploration & Development Corp.
License Number: 0441972
License Date: 2011-12-22
License Status: Amended
Spud Date: 2012-01-30
Final Drill Date: 2012-02-28
Well Total Depth: 3925.00 m
Surface Hole Latitude: 53.995916
Surface Hole Longitude: -118.392356

For data sources see[1][2]

Well History

Date Event
2011-12-22 Obtained License
2012-01-31 Lost Circulation Occurred
2012-02-03 Surface Casing Operation Performed
2012-02-04 Well Log Performed
2012-02-09 Direction Drilling Operation Performed - Deviate
2012-02-13 Intermediate Casing Operation Performed
2012-02-15 Direction Drilling Operation Performed - Horizontal
2012-02-28 Finished Drilling
2012-02-28 Well Mode changed to Drilled and Cased
2012-03-01 Liner Casing Operation Performed
2012-03-01 Perforation Treatment Performed - Open-Hole Completion
2012-03-03 Rig Released
2012-03-07 Well Log Performed
2012-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-13 Well Began Production
2012-03-13 Well Fluid changed to Gas
2012-03-13 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-02-09 2290.00 Deviate (5 - 79 degrees)
2012-02-15 2837.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-01 Open Hole/Barefoot Completion 3914.00 3925.00 0
2012-03-11 Multi-Stage Fracture 3811.60 3811.70 0
2012-03-11 Multi-Stage Fracture 3577.10 3577.20 0
2012-03-12 Multi-Stage Fracture 3352.80 3352.90 0
2012-03-12 Multi-Stage Fracture 3047.50 3047.60 0
2012-03-12 Multi-Stage Fracture 2933.90 2934.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6649 0.0 0.0 0.0
2013 8130 0.0 0.0 0.0
2014 4896 0.0 0.0 0.0
2015 7838 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8663 0.0 0.0 0.0
2018 8622 0.0 0.0 0.0
2019 8577 0.0 0.0 0.0
2020 2143 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-01-31 Lost Circulation 51.00 64.00

For data sources see[7]

References