If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0586023504020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.082081,"lon":-118.191053,"icon":""}]} |
Location: 02/04-35-058-02W6/0 | |
Location Alias: 02/04-35-58-02 W6M | |
Location Alias 2: 02/04-35-058-02 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 6 | |
Range: 02 | |
Section: 35 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: JUPITER HZ SMOKY 4-35-58-2 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0489879 | |
License Date: 2018-07-05 | |
License Status: Amended | |
Spud Date: 2019-07-16 | |
Final Drill Date: 2019-08-19 | |
Well Total Depth: 6604.00 m | |
Surface Hole Latitude: 54.082081 | |
Surface Hole Longitude: -118.191053 |
Date | Event |
---|---|
2018-07-05 | Obtained License |
2019-07-16 | Drill To LD |
2019-07-16 | Lost Circulation Occurred |
2019-07-20 | Surface Casing Operation Performed |
2019-07-29 | Direction Drilling Operation Performed - Deviate |
2019-08-03 | Intermediate Casing Operation Performed |
2019-08-05 | Direction Drilling Operation Performed - Horizontal |
2019-08-19 | Finished Drilling |
2019-08-19 | Well Log Performed |
2019-08-19 | Well Mode changed to Drilled and Cased |
2019-08-23 | Liner Casing Operation Performed |
2019-08-26 | Rig Released |
2019-10-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-10-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-11-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-11-29 | Well Fluid changed to Gas |
2019-11-29 | Well Mode changed to Testing |
2019-12-12 | Well Began Production |
2019-12-12 | Well Fluid changed to Gas |
2019-12-12 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-07-16 | Nabors Drilling Canada Limited | 60 | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-07-29 | 2990.90 | Deviate (5 - 79 degrees) |
2019-08-05 | 3406.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-10-30 | Multi-Stage Fracture | 6568.30 | 6568.40 | 0 |
2019-10-30 | Multi-Stage Fracture | 5773.70 | 5773.80 | 0 |
2019-10-30 | Multi-Stage Fracture | 5686.20 | 5686.30 | 0 |
2019-10-31 | Multi-Stage Fracture | 5598.30 | 5598.40 | 0 |
2019-10-31 | Multi-Stage Fracture | 5510.40 | 5510.50 | 0 |
2019-10-31 | Multi-Stage Fracture | 5423.30 | 5423.40 | 0 |
2019-10-31 | Multi-Stage Fracture | 5336.40 | 5336.50 | 0 |
2019-10-31 | Multi-Stage Fracture | 5248.30 | 5248.40 | 0 |
2019-10-31 | Multi-Stage Fracture | 5160.40 | 5160.50 | 0 |
2019-10-31 | Multi-Stage Fracture | 5071.20 | 5071.30 | 0 |
2019-10-31 | Multi-Stage Fracture | 4983.20 | 4983.30 | 0 |
2019-10-30 | Multi-Stage Fracture | 6475.30 | 6475.40 | 0 |
2019-10-31 | Multi-Stage Fracture | 4894.00 | 4894.10 | 0 |
2019-10-31 | Multi-Stage Fracture | 4806.20 | 4806.30 | 0 |
2019-10-31 | Multi-Stage Fracture | 4717.00 | 4717.10 | 0 |
2019-10-31 | Multi-Stage Fracture | 4628.30 | 4628.40 | 0 |
2019-10-31 | Multi-Stage Fracture | 4539.10 | 4539.20 | 0 |
2019-10-31 | Multi-Stage Fracture | 4450.10 | 4450.20 | 0 |
2019-10-31 | Multi-Stage Fracture | 4360.80 | 4360.90 | 0 |
2019-10-31 | Multi-Stage Fracture | 4272.00 | 4272.10 | 0 |
2019-11-01 | Multi-Stage Fracture | 4182.90 | 4183.00 | 0 |
2019-11-01 | Multi-Stage Fracture | 4094.10 | 4094.20 | 0 |
2019-10-30 | Multi-Stage Fracture | 6387.90 | 6388.00 | 0 |
2019-11-01 | Multi-Stage Fracture | 4006.40 | 4006.50 | 0 |
2019-11-01 | Multi-Stage Fracture | 3918.30 | 3918.40 | 0 |
2019-11-01 | Multi-Stage Fracture | 3830.40 | 3830.50 | 0 |
2019-11-01 | Multi-Stage Fracture | 3742.10 | 3742.20 | 0 |
2019-11-01 | Multi-Stage Fracture | 3653.70 | 3653.80 | 0 |
2019-11-01 | Multi-Stage Fracture | 3565.00 | 3565.10 | 0 |
2019-11-01 | Multi-Stage Fracture | 3476.90 | 3477.00 | 0 |
2019-10-30 | Multi-Stage Fracture | 6300.10 | 6300.20 | 0 |
2019-10-30 | Multi-Stage Fracture | 6212.20 | 6212.30 | 0 |
2019-10-30 | Multi-Stage Fracture | 6124.40 | 6124.50 | 0 |
2019-10-30 | Multi-Stage Fracture | 6036.80 | 6036.90 | 0 |
2019-10-30 | Multi-Stage Fracture | 5949.00 | 5949.10 | 0 |
2019-10-30 | Multi-Stage Fracture | 5861.20 | 5861.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-10-30 | 2019-11-01 | 3,315 | 19,297 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 83.0883 | N/A | |||
40/70 Prime Plus | Calfrac | Quartz | 14808-60-7 | 100 | 2.8502 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 12.7428 | N/A | ||
50/140 Sand (Domestic) | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 1.1714 | N/A | ||
SaniFrac 8844. Biocide | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0108 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0108 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0108 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0108 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0108 | N/A | ||||
DWP-913. Clay Control | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0455 | N/A | |
DynaRate 6104. Friction Reducer | Calfrac | Friction Reducer | Ammonium Chloride | 12125-02-9 | 100 | 0.0906 | N/A | |
Hydrotreated Kerosene | 64742-47-8 | 100 | 0.0906 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0906 | N/A | ||||
Oleamide | Trade Secret | 100 | 0.0906 | N/A | ||||
DynaScale 3515. Scale Inhibitor | Calfrac | Scale Inhibitor | Methanol | 67-56-1 | 100 | 0.0005 | N/A | |
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0005 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-10-30 | 2019-11-01 | Central Water Distribution Facility | 16635 |
2019-10-29 | 2019-10-29 | Central Water Distribution Facility | 1716 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 580 | 0.0 | 0.0 | 0.0 |
2020 | 2154 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-07-16 | Lost Circulation | 118.00 | 146.00 |
2019-11-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]