X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0586023503020

Well Details

Well ID: 0586023503020
Loading map...
Location: 02/03-35-058-02W6/0
Location Alias: 02/03-35-58-02 W6M
Location Alias 2: 02/03-35-058-02 W6/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 6
Range: 02
Section: 35
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ SMOKY 3-35-58-2
Operator Name: Jupiter Resources Inc.
License Number: 0489878
License Date: 2018-07-05
License Status: Amended
Spud Date: 2019-08-28
Final Drill Date: 2019-09-23
Well Total Depth: 6487.00 m
Surface Hole Latitude: 54.082009
Surface Hole Longitude: -118.191050

For data sources see[1][2]

Well History

Date Event
2018-07-05 Obtained License
2019-08-28 Drill To LD
2019-08-28 Lost Circulation Occurred
2019-08-30 Surface Casing Operation Performed
2019-09-06 Direction Drilling Operation Performed - Deviate
2019-09-10 Intermediate Casing Operation Performed
2019-09-13 Direction Drilling Operation Performed - Horizontal
2019-09-23 Finished Drilling
2019-09-23 Well Log Performed
2019-09-23 Well Mode changed to Drilled and Cased
2019-09-25 Liner Casing Operation Performed
2019-09-29 Rig Released
2019-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-29 Well Fluid changed to Gas
2019-11-29 Well Mode changed to Testing
2019-12-16 Well Began Production
2019-12-16 Well Fluid changed to Gas
2019-12-16 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-08-28 Nabors Drilling Canada Limited 60 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-09-06 2988.90 Deviate (5 - 79 degrees)
2019-09-13 3405.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-10-27 Multi-Stage Fracture 6435.70 6435.80 0
2019-10-28 Multi-Stage Fracture 5536.90 5537.00 0
2019-10-28 Multi-Stage Fracture 5434.10 5434.20 0
2019-10-28 Multi-Stage Fracture 5345.60 5345.70 0
2019-10-28 Multi-Stage Fracture 5258.20 5258.30 0
2019-10-28 Multi-Stage Fracture 5171.20 5171.30 0
2019-10-28 Multi-Stage Fracture 5083.30 5083.40 0
2019-10-28 Multi-Stage Fracture 4995.10 4995.20 0
2019-10-28 Multi-Stage Fracture 4907.70 4907.80 0
2019-10-28 Multi-Stage Fracture 4820.00 4820.10 0
2019-10-28 Multi-Stage Fracture 4732.20 4732.30 0
2019-10-27 Multi-Stage Fracture 6349.40 6349.50 0
2019-10-29 Multi-Stage Fracture 4644.20 4644.30 0
2019-10-29 Multi-Stage Fracture 4555.70 4555.80 0
2019-10-29 Multi-Stage Fracture 4469.30 4469.40 0
2019-10-29 Multi-Stage Fracture 4385.10 4385.20 0
2019-10-29 Multi-Stage Fracture 4298.00 4298.10 0
2019-10-29 Multi-Stage Fracture 4210.30 4210.40 0
2019-10-29 Multi-Stage Fracture 4121.70 4121.80 0
2019-10-29 Multi-Stage Fracture 4036.60 4036.70 0
2019-10-29 Multi-Stage Fracture 3950.00 3950.10 0
2019-10-29 Multi-Stage Fracture 3862.80 3862.90 0
2019-10-27 Multi-Stage Fracture 6246.50 6246.60 0
2019-10-29 Multi-Stage Fracture 3775.90 3776.00 0
2019-10-29 Multi-Stage Fracture 3688.40 3688.50 0
2019-10-29 Multi-Stage Fracture 3600.10 3600.20 0
2019-10-29 Multi-Stage Fracture 3513.50 3513.60 0
2019-10-29 Multi-Stage Fracture 3426.80 3426.90 0
2019-10-27 Multi-Stage Fracture 6131.10 6131.20 0
2019-10-27 Multi-Stage Fracture 5999.90 6000.00 0
2019-10-27 Multi-Stage Fracture 5911.80 5911.90 0
2019-10-28 Multi-Stage Fracture 5825.50 5825.60 0
2019-10-28 Multi-Stage Fracture 5739.10 5739.20 0
2019-10-28 Multi-Stage Fracture 5637.20 5637.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-10-27 2019-10-29 3,315 17,221 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 84.1762 N/A
40/70 Prime Plus Calfrac Quartz 14808-60-7 100 2.8285 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 12.6474 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 1.1647 N/A
SaniFrac 8844. Biocide Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0117 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0117 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0117 N/A
Polyethylene glycol 25322-68-3 100 0.0117 N/A
Sodium bromide 7647-15-6 100 0.0117 N/A
DWP-913. Clay Control Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0465 N/A
DynaRate 6104. Friction Reducer Calfrac Friction Reducer Ammonium Chloride 12125-02-9 100 0.0926 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0926 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0926 N/A
Oleamide Trade Secret 100 0.0926 N/A
DynaScale 3515. Scale Inhibitor Calfrac Scale Inhibitor Methanol 67-56-1 100 0.0132 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0132 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-10-17 2019-10-28 Surface Water - Runoff 4980
2019-10-26 2019-10-29 Central Water Distribution Facility 2684
2019-10-28 2019-10-29 Central Water Distribution Facility 11477
2019-10-26 2019-10-26 Central Water Distribution Facility 502

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 478 0.0 0.0 0.0
2020 2172 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-08-28 Lost Circulation 127.00 151.00
2019-11-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References