X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0586013012020

Well Details

Well ID: 0586013012020
Loading map...
Location: 02/12-30-058-01W6/0
Location Alias: 02/12-30-58-01 W6M
Location Alias 2: 02/12-30-058-01 W6/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 6
Range: 01
Section: 30
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ 102 SMOKY 12-30-58-1
Operator Name: Tourmaline Oil Corp.
License Number: 0475356
License Date: 2015-05-01
License Status: Issued
Spud Date: 2016-01-17
Final Drill Date: 2016-02-13
Well Total Depth: 4552.00 m
Surface Hole Latitude: 54.041329
Surface Hole Longitude: -118.126563

For data sources see[1][2]

Well History

Date Event
2015-05-01 Obtained License
2016-01-17 Lost Circulation Occurred
2016-01-21 Surface Casing Operation Performed
2016-01-27 Intermediate Casing Operation Performed
2016-02-01 Direction Drilling Operation Performed - Deviate
2016-02-06 Direction Drilling Operation Performed - Horizontal
2016-02-07 Well Log Performed
2016-02-13 Finished Drilling
2016-02-13 Well Log Performed
2016-02-13 Well Mode changed to Drilled and Cased
2016-02-16 Production Casing Operation Performed
2016-02-17 Rig Released
2016-02-21 Well Log Performed
2016-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2016-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2016-02-26 Well Began Production
2016-02-26 Well Fluid changed to Gas
2016-02-26 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-01-17 Patterson-UTI Drilling Co. Canada 17E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-02-01 2893.00 Deviate (5 - 79 degrees)
2016-02-06 3472.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-02-25 Multi-Stage Fracture 4493.80 4493.90 0
2016-02-25 Multi-Stage Fracture 4031.20 4031.30 0
2016-02-25 Multi-Stage Fracture 3978.30 3978.40 0
2016-02-26 Multi-Stage Fracture 3925.60 3925.70 0
2016-02-26 Multi-Stage Fracture 3872.70 3872.80 0
2016-02-26 Multi-Stage Fracture 3819.80 3819.90 0
2016-02-26 Multi-Stage Fracture 3767.10 3767.20 0
2016-02-26 Multi-Stage Fracture 3714.40 3714.50 0
2016-02-26 Multi-Stage Fracture 3661.60 3661.70 0
2016-02-26 Multi-Stage Fracture 3608.80 3608.90 0
2016-02-26 Multi-Stage Fracture 3555.90 3556.00 0
2016-02-25 Multi-Stage Fracture 4452.10 4452.20 0
2016-02-26 Multi-Stage Fracture 3515.70 3515.80 0
2016-02-26 Multi-Stage Fracture 3475.50 3475.60 0
2016-02-25 Multi-Stage Fracture 4399.80 4399.90 0
2016-02-25 Multi-Stage Fracture 4347.40 4347.50 0
2016-02-25 Multi-Stage Fracture 4294.90 4295.00 0
2016-02-25 Multi-Stage Fracture 4242.40 4242.50 0
2016-02-25 Multi-Stage Fracture 4189.50 4189.60 0
2016-02-25 Multi-Stage Fracture 4136.70 4136.80 0
2016-02-25 Multi-Stage Fracture 4083.80 4083.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-02-25 2016-02-26 3,307 6,323 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.1651 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 4.5609 N/A
silica crystalline 14808-60-7 100 4.5609 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 9.7925 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.3772 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0105 N/A
dibromoacetonitrile 3252-43-5 100 0.0105 N/A
non-hazardous ingredients Not Available 100 0.0105 N/A
polyethylene glycol 25322-68-3 100 0.0105 N/A
sodium bromide 7647-15-6 100 0.0105 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1538 N/A
water Not Available 100 0.1538 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0875 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0875 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0875 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0875 N/A
non-hazardous ingredients Not Available 100 0.0875 N/A
S-2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.0694 N/A
isopropanol 67-63-0 100 0.0694 N/A
methanol 67-56-1 100 0.0694 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.0694 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0694 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-01-07 2016-01-28 Oilfield Produced Water 875
2016-01-05 2016-01-07 Groundwater - Non-saline less than or equal to 150m deep 237
2016-02-22 2016-02-26 Recycled Fracturing Water (treated at well site) 3543
2016-02-24 2016-02-24 Recycled Fracturing Water (treated at well site) 1630

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 7417 0.0 0.0 0.0
2017 8603 0.0 0.0 0.0
2018 8712 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 1956 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-01-17 Lost Circulation 66.00 137.00
2016-03-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References