X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0586013012000

Well Details

Well ID: 0586013012000
Loading map...
Location: 00/12-30-058-01W6/0
Location Alias: 00/12-30-58-01 W6M
Location Alias 2: 00/12-30-058-01 W6/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 6
Range: 01
Section: 30
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE SMOKY 12-30-58-1
Operator Name: Tourmaline Oil Corp.
License Number: 0415505
License Date: 2009-12-11
License Status: Issued
Spud Date: 2010-01-27
Final Drill Date: 2010-02-14
Well Total Depth: 3530.00 m
Surface Hole Latitude: 54.044386
Surface Hole Longitude: -118.148495

For data sources see[1][2]

Well History

Date Event
2009-12-11 Obtained License
2010-01-29 Surface Casing Operation Performed
2010-02-14 Finished Drilling
2010-02-14 Well Mode changed to Drilled and Cased
2010-02-15 Well Log Performed
2010-02-16 Production Casing Operation Performed
2010-02-17 Rig Released
2010-02-21 Well Log Performed
2010-02-22 Perforation Treatment Performed - Jet Perforation
2010-02-22 Well Log Performed
2010-03-05 Perforation Treatment Performed - Fractured
2010-03-05 Perforation Treatment Performed - Jet Perforation
2010-03-06 Perforation Treatment Performed - Jet Perforation
2010-03-07 Perforation Treatment Performed - Fractured
2010-03-07 Perforation Treatment Performed - Jet Perforation
2010-03-11 Well Log Performed
2010-04-11 Well Began Production
2010-04-11 Well Fluid changed to Gas
2010-04-11 Well Mode changed to Flowing
2012-02-07 Well Fluid changed to Gas
2012-02-07 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-22 Perforation 3451.00 3452.00 26
2010-03-06 Perforation 3041.00 3042.00 9
2010-03-07 Fracture 3041.00 3265.00 0
2010-03-07 Perforation 2892.00 2892.50 6
2010-03-07 Perforation 2829.50 2830.00 3
2010-03-07 Perforation 2439.50 2440.00 3
2010-03-07 Perforation 2429.50 2430.00 3
2010-03-07 Fracture 2429.50 2892.50 0
2010-03-05 Fracture 3451.00 3452.00 0
2010-03-05 Perforation 3431.00 3431.50 6
2010-03-05 Perforation 3406.50 3407.00 6
2010-03-05 Perforation 3388.50 3389.00 6
2010-03-05 Perforation 3334.00 3334.50 3
2010-03-05 Fracture 3334.00 3431.50 0
2010-03-06 Perforation 3264.00 3265.00 6
2010-03-06 Perforation 3244.00 3245.00 6

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5476 0.0 0.0 0.0
2011 8372 0.0 0.0 0.0
2012 8634 0.0 0.0 0.0
2013 7528 0.0 0.0 0.0
2014 5748 0.0 0.0 0.0
2015 7873 0.0 0.0 0.0
2016 7132 0.0 0.0 0.0
2017 7857 0.0 0.0 0.0
2018 8435 0.0 0.0 0.0
2019 8544 0.0 0.0 0.0
2020 1800 0.0 0.0 0.0

For data sources see[5]

References